MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 22,140 2,702 18,049 51 44.19 38.42
87%
2 Constr of Cement Concrete Roads 2,235 2 1,627 296 33.97 21.23
63%
3 Construction of Road and Culvert 2,117 1 1,744 211 80.78 44.90
56%
4 Construction of NADEP/Vermi Compost Pit 1,631 0 359 550 0.76 0.32
42%
5 Plantation 1,423 104 402 641 21.29 5.66
27%
6 Construction of Toilets 1,328 0 995 41 1.62 1.16
72%
7 Land Development 1,219 0 900 123 16.22 8.18
50%
8 Construction of Check Dam/Stop Dam 1,181 1 798 288 33.48 17.66
53%
9 Farm Pond 745 1 597 11 6.04 1.93
32%
10 Construction of Bund 417 0 178 202 9.81 6.34
65%
11 Solid and Liquid Waste Management 392 0 61 90 2.02 1.18
59%
12 Construction of Percolation Tank 356 5 145 129 11.82 4.07
34%
13 Construction of Trench 341 1 199 98 9.40 5.85
62%
14 Repair & maint of Pond/ Tank 295 1 115 146 12.69 6.27
49%
15 Constr of GP Bhawan 274 1 135 113 8.20 4.35
53%
16 Construction of Play field 231 0 93 34 5.50 1.18
22%
17 Boulder Check/Gully Plug 230 0 132 96 0.63 0.29
46%
18 Culvert 228 0 185 15 8.62 6.29
73%
19 Construction of Well 226 1 148 16 4.31 3.38
79%
20 Constr of Gabion 169 0 127 20 1.41 0.78
56%
21 Construction of Crematorium 161 0 133 7 5.92 3.91
66%
22 Well Recharge 134 0 42 10 1.19 0.67
57%
23 Repair & maint of Water Harvesting Structures 129 0 11 82 0.96 0.65
67%
24 Terracing 125 0 9 96 0.24 0.16
65%
25 Roof Water Harvesting on gov/panchayat bldg 104 0 71 28 0.49 0.18
36%
26 Construction of Tank 104 1 30 53 6.11 2.76
45%
27 Constr of Aganwadi 102 0 70 12 2.35 1.68
72%
28 Repair & Maint of Check Dam/Stop Dam 82 0 12 57 0.52 0.42
81%
29 Repair & Maint of Bund 71 0 16 49 0.55 0.43
78%
30 Construction of Recharge Pits 70 3 25 24 0.73 0.27
37%
31 Constr of Kitchen Shed 58 6 4 39 0.87 0.35
41%
32 Constr of Food Grain storage 52 1 10 36 1.09 0.41
38%
33 Other Works 48 1 25 18 0.04 0.03
70%
34 Cattle Shed 41 2 11 18 5.20 2.03
39%
35 Constr of Compound wall 41 0 26 13 0.96 0.75
78%
36 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 41 0 32 3 2.02 0.92
46%
37 Repaire and Maint of NADEP/Vermi Compost Pit 31 0 6 25 0.05 0.00
5%
38 Repair & Maint of Community infrastructure 30 1 18 10 1.06 0.55
51%
39 Repair & maint of Percolation Tank 28 0 7 18 0.36 0.25
69%
40 Repair & maint of Road 27 0 5 17 0.19 0.02
11%
41 Grass Land Development 21 0 2 11 0.55 0.14
25%
42 Construction of Spur 12 0 3 9 0.09 0.05
52%
43 Underground Dyke for Ground Water Recharge 11 0 6 3 0.21 0.15
70%
44 Construction of building/workshed for SHG 10 0 1 5 0.05 0.02
33%
45 Construction of Canal 7 0 0 4 0.00 0.00
0%
46 Repair & Maint of Canal 5 0 1 4 0.00 0.00
59%
47 Community Sanitary Complex 5 0 0 5 0.01 0.00
0%
48 Goat Shelter 4 0 2 2 0.06 0.02
39%
49 Nursery Development 4 1 0 1 0.74 0.13
17%
50 Construction of Embankment 4 0 0 4 0.00 0.00
0%
51 Construction of Village Haats 4 0 2 2 0.07 0.05
74%
52 Lining of Canal 3 0 1 1 0.04 0.04
88%
53 Lift Irrigation 3 0 0 1 0.03 0.00
0%
54 Renovation of traditional water bodies 3 0 2 0 0.03 0.05
168%
55 Poultry Shelter 2 0 1 1 0.04 0.02
40%
56 Bio-gas plant 2 0 1 0 0.00 0.00
82%
57 Construction of Fish Drying Infrastructure 2 0 0 2 0.00 0.00
0%
58 Piggery Shelter 1 0 0 1 0.00 0.00
0%
59 Works for Flood Control and Protection 1 0 1 0 0.29 0.21
72%
60 Construction of Other Community Building/Assets 1 0 1 0 0.06 0.03
50%
61 Renovation of Canal 1 0 1 0 0.08 0.04
52%
Total 38,763 2,836 27,577 3,842 346.01 196.85
All 61 rows (zero-value rows hidden) ⇩ Export to Excel