MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 33,546 1,831 29,265 302 63.53 55.62
88%
2 Construction of Check Dam/Stop Dam 10,132 68 6,148 1,634 106.40 95.23
90%
3 Construction of Bund 6,240 26 3,008 1,534 57.16 29.26
51%
4 Construction of Well 3,308 98 1,877 425 53.41 35.03
66%
5 Plantation 3,072 538 1,122 555 44.27 16.63
38%
6 Constr of Cement Concrete Roads 2,855 36 2,054 181 59.16 50.28
85%
7 Land Development 2,435 19 1,252 445 14.29 7.90
55%
8 Construction of Road and Culvert 2,326 5 1,417 218 50.72 55.89
110%
9 Farm Pond 2,132 35 1,177 65 21.99 9.09
41%
10 Renovation of traditional water bodies 2,012 0 1,628 7 12.02 15.07
125%
11 Well Recharge 1,040 21 478 171 7.61 5.07
67%
12 Terracing 1,026 9 434 282 5.44 3.11
57%
13 Construction of Tank 980 59 256 136 39.15 21.03
54%
14 Boulder Check/Gully Plug 640 8 373 141 5.20 3.11
60%
15 Construction of Trench 632 7 373 101 12.66 8.20
65%
16 Solid and Liquid Waste Management 585 7 250 217 2.26 1.47
65%
17 Construction of Percolation Tank 543 5 276 92 11.97 5.87
49%
18 Construction of NADEP/Vermi Compost Pit 522 3 220 82 2.48 1.29
52%
19 Construction of Recharge Pits 468 3 135 171 1.47 0.87
59%
20 Goat Shelter 436 0 252 45 3.72 2.26
61%
21 Repair & maint of Pond/ Tank 335 7 111 103 5.45 3.48
64%
22 Cattle Shed 319 1 106 47 3.81 1.94
51%
23 Constr of Aganwadi 285 17 105 84 4.93 3.10
63%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 276 2 124 10 2.61 0.81
31%
25 Constr of Gabion 234 6 108 62 3.49 2.66
76%
26 Repair & Maint of Community infrastructure 198 0 68 49 4.76 2.03
43%
27 Repair & maint of Water Harvesting Structures 188 0 86 37 0.72 0.50
70%
28 Repair & Maint of Check Dam/Stop Dam 174 0 67 67 3.87 2.12
55%
29 Roof Water Harvesting on gov/panchayat bldg 156 12 37 4 2.09 1.05
51%
30 Construction of Crematorium 154 1 101 16 4.43 2.89
65%
31 Community Sanitary Complex 142 6 77 33 0.98 0.44
44%
32 Constr of GP Bhawan 136 11 49 50 2.49 1.09
44%
33 Repair & maint of Road 122 1 52 44 1.91 1.52
79%
34 Construction of Play field 111 2 77 18 6.55 4.16
63%
35 Construction of Toilets 104 4 48 33 0.57 0.38
66%
36 Construction of Other Community Building/Assets 100 3 17 18 2.02 0.59
29%
37 Constr of Compound wall 85 4 21 32 2.01 1.36
68%
38 Repair & Maint of Bund 75 0 30 27 1.10 0.73
66%
39 Culvert 72 0 21 1 0.73 0.50
68%
40 Construction of Spur 71 0 21 27 1.17 0.65
55%
41 Nursery Development 70 1 32 8 0.83 0.41
49%
42 Other Works 69 1 35 11 0.54 0.40
74%
43 Bio-Fertilizer 68 0 30 20 0.42 0.31
74%
44 Repair & maint of Percolation Tank 53 0 21 24 0.90 0.63
69%
45 Constr of Food Grain storage 53 8 8 13 0.98 0.47
48%
46 Poultry Shelter 52 1 23 17 0.56 0.46
82%
47 Constr of Kitchen Shed 46 1 15 26 0.11 0.05
48%
48 Construction of building/workshed for SHG 44 4 26 6 1.07 0.80
75%
49 Construction of Fish Drying Infrastructure 32 1 11 2 0.31 0.16
52%
50 Underground Dyke for Ground Water Recharge 32 1 18 1 0.90 0.64
72%
51 Grass Land Development 25 1 8 9 0.26 0.09
36%
52 Lining of Canal 23 0 9 10 0.61 0.08
14%
53 Repaire and Maint of NADEP/Vermi Compost Pit 21 1 5 4 0.08 0.04
52%
54 Construction of Canal 20 0 6 5 0.16 0.06
38%
55 Piggery Shelter 19 2 7 1 0.09 0.05
61%
56 Deepening / Desilting of Flood Channels 18 0 16 0 0.26 0.25
98%
57 Bio-gas plant 14 0 1 1 0.02 0.00
28%
58 Construction of Village Haats 11 1 7 1 0.19 0.10
51%
59 Construction of Embankment 9 0 2 1 0.18 0.13
72%
60 Repair & Maint of Canal 3 0 1 2 0.03 0.01
30%
61 Works for Flood Control and Protection 2 0 0 1 0.03 0.02
51%
62 Repair & maint of Gully Plugs 1 0 0 1 0.00 0.00
0%
Total 78,952 2,878 53,602 7,730 639.13 459.45
All 62 rows (zero-value rows hidden) ⇩ Export to Excel