MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 31,572 5,014 22,460 454 62.36 48.21
77%
2 Construction of Trench 4,277 10 3,053 315 104.81 72.77
69%
3 Construction of Check Dam/Stop Dam 4,234 86 2,044 1,114 1,258.59 127.83
10%
4 Plantation 3,119 546 1,120 799 74.60 26.12
35%
5 Construction of Road and Culvert 2,666 14 1,509 245 146.35 98.85
68%
6 Construction of Well 2,496 249 1,140 452 41.35 28.52
69%
7 Constr of Cement Concrete Roads 1,936 77 961 217 54.66 38.09
70%
8 Farm Pond 1,633 126 791 73 23.73 16.59
70%
9 Construction of Bund 1,543 4 588 625 14.97 9.34
62%
10 Land Development 1,257 10 671 129 19.31 9.34
48%
11 Well Recharge 1,218 79 463 238 14.55 8.07
55%
12 Construction of Percolation Tank 1,077 27 292 348 29.31 19.05
65%
13 Underground Dyke for Ground Water Recharge 1,045 3 613 64 85.98 75.05
87%
14 Construction of Tank 860 93 136 243 33.99 13.47
40%
15 Boulder Check/Gully Plug 613 3 287 260 2.52 1.66
66%
16 Construction of Recharge Pits 609 22 145 290 5.44 3.00
55%
17 Renovation of traditional water bodies 590 0 255 0 9.92 4.10
41%
18 Construction of Toilets 528 1 145 14 3.43 1.00
29%
19 Construction of NADEP/Vermi Compost Pit 353 5 100 185 0.78 0.26
33%
20 Solid and Liquid Waste Management 284 11 42 101 1.47 0.96
65%
21 Repair & maint of Water Harvesting Structures 280 4 126 112 2.65 2.03
77%
22 Cattle Shed 237 25 53 115 1.10 0.61
56%
23 Terracing 233 3 74 121 3.35 2.05
61%
24 Construction of Crematorium 194 3 142 17 3.35 2.64
79%
25 Construction of Spur 191 7 67 74 3.34 1.92
58%
26 Constr of Aganwadi 157 14 74 47 7.63 4.66
61%
27 Roof Water Harvesting on gov/panchayat bldg 153 2 59 58 0.62 0.49
79%
28 Repair & maint of Pond/ Tank 127 4 47 66 1.74 1.26
72%
29 Other Works 124 2 46 54 0.84 0.47
56%
30 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 111 14 32 52 4.75 2.27
48%
31 Constr of Gabion 108 4 30 48 0.80 0.46
57%
32 Culvert 98 0 38 6 5.72 3.89
68%
33 Repair & Maint of Check Dam/Stop Dam 93 4 23 57 3.54 2.35
66%
34 Repair & maint of Road 88 2 25 45 3.99 2.80
70%
35 Repair & maint of Percolation Tank 87 4 26 46 2.81 2.19
78%
36 Constr of GP Bhawan 80 5 22 34 1.41 0.53
37%
37 Constr of Compound wall 68 4 22 31 2.44 1.30
53%
38 Construction of Play field 66 0 37 13 1.64 0.77
47%
39 Goat Shelter 59 8 12 28 0.10 0.06
62%
40 Repair & Maint of Community infrastructure 46 2 23 15 0.80 0.62
77%
41 Constr of Food Grain storage 40 1 12 25 0.85 0.73
86%
42 Repair & Maint of Bund 36 0 18 14 0.51 0.33
65%
43 Construction of Other Community Building/Assets 26 2 2 15 0.65 0.20
31%
44 Constr of Kitchen Shed 25 0 11 14 0.09 0.04
41%
45 Poultry Shelter 22 0 11 8 0.08 0.05
71%
46 Construction of building/workshed for SHG 21 1 8 4 0.48 0.25
53%
47 Community Sanitary Complex 16 3 7 3 0.06 0.04
69%
48 Nursery Development 15 0 7 7 0.08 0.07
78%
49 Construction of Fish Drying Infrastructure 8 1 0 1 0.03 0.01
30%
50 Construction of Embankment 8 0 2 5 0.03 0.02
88%
51 Grass Land Development 6 0 0 4 0.04 0.01
32%
52 Construction of Village Haats 5 0 1 2 0.21 0.15
70%
53 Bio-Fertilizer 4 0 1 0 0.10 0.09
88%
54 Construction of Canal 4 0 1 1 0.06 0.04
67%
55 Works for Flood Control and Protection 4 0 2 0 0.18 0.18
99%
56 Strengthening of Embankment 3 0 0 0 0.22 0.07
31%
57 Piggery Shelter 2 1 0 1 0.02 0.02
85%
58 Bio-gas plant 1 0 0 0 0.00 0.00
0%
59 Lining of Canal 1 0 0 1 0.00 0.00
0%
Total 64,757 6,500 37,876 7,310 2,044.42 637.92
All 59 rows (zero-value rows hidden) ⇩ Export to Excel