MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 25,827 2,354 21,206 310 49.35 40.66
82%
2 Plantation 6,413 355 4,582 551 155.02 50.04
32%
3 Construction of Check Dam/Stop Dam 4,787 26 3,088 188 72.64 49.41
68%
4 Land Development 3,966 9 2,941 215 22.07 13.47
61%
5 Farm Pond 3,423 21 1,983 455 37.40 19.78
53%
6 Construction of Well 3,411 174 2,261 281 57.74 40.41
70%
7 Constr of Cement Concrete Roads 2,198 16 1,561 179 27.88 18.00
65%
8 Construction of Road and Culvert 1,863 21 1,250 149 110.62 72.34
65%
9 Solid and Liquid Waste Management 1,698 26 945 580 3.47 1.41
41%
10 Cattle Shed 1,396 23 1,057 99 10.09 7.99
79%
11 Construction of Bund 1,287 0 872 188 8.81 5.30
60%
12 Construction of Toilets 1,088 8 945 5 8.19 5.67
69%
13 Construction of Percolation Tank 891 12 438 264 18.68 12.64
68%
14 Well Recharge 862 6 172 81 5.88 3.38
58%
15 Construction of Recharge Pits 784 7 260 166 6.98 3.78
54%
16 Construction of Trench 618 2 370 81 7.59 5.05
67%
17 Construction of Tank 501 10 217 119 9.47 5.62
59%
18 Construction of NADEP/Vermi Compost Pit 463 7 182 214 1.37 0.38
28%
19 Constr of Gabion 387 17 191 138 7.74 5.08
66%
20 Roof Water Harvesting on gov/panchayat bldg 278 2 102 121 1.16 0.60
52%
21 Boulder Check/Gully Plug 276 5 164 69 5.96 3.99
67%
22 Repair & maint of Pond/ Tank 251 6 129 79 4.15 1.79
43%
23 Constr of GP Bhawan 217 12 109 70 6.83 4.55
67%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 165 2 119 27 2.04 1.26
62%
25 Construction of Crematorium 154 5 95 20 3.43 1.77
52%
26 Grass Land Development 154 3 46 58 2.65 1.40
53%
27 Goat Shelter 134 1 90 18 0.48 0.37
77%
28 Renovation of traditional water bodies 119 0 116 0 1.69 1.56
93%
29 Construction of Play field 95 0 59 10 2.46 1.02
41%
30 Underground Dyke for Ground Water Recharge 91 2 39 44 2.09 0.91
44%
31 Constr of Aganwadi 67 7 23 26 1.01 0.61
61%
32 Community Sanitary Complex 66 9 35 10 0.37 0.21
58%
33 Constr of Compound wall 64 5 32 22 2.38 1.44
61%
34 Works for Flood Control and Protection 62 0 35 4 1.30 0.88
68%
35 Culvert 60 6 31 10 1.78 1.32
74%
36 Terracing 60 3 31 14 0.64 0.49
76%
37 Other Works 56 0 39 5 0.22 0.12
54%
38 Repair & maint of Water Harvesting Structures 54 0 20 26 0.81 0.50
61%
39 Repair & Maint of Check Dam/Stop Dam 36 2 13 16 0.55 0.23
42%
40 Poultry Shelter 34 0 16 12 0.09 0.07
74%
41 Repair & maint of Percolation Tank 32 2 16 7 0.76 0.60
78%
42 Repair & Maint of Community infrastructure 31 0 13 13 0.89 0.53
60%
43 Construction of Spur 31 0 10 12 1.06 0.87
82%
44 Repair & maint of Road 27 0 18 4 1.82 1.49
82%
45 Bio-Fertilizer 24 0 13 4 0.10 0.06
59%
46 Construction of Fish Drying Infrastructure 21 0 4 5 0.09 0.07
75%
47 Constr of Kitchen Shed 20 0 4 14 0.13 0.07
54%
48 Construction of building/workshed for SHG 19 0 5 11 0.11 0.07
61%
49 Repaire and Maint of NADEP/Vermi Compost Pit 14 1 5 7 0.07 0.01
20%
50 Construction of Other Community Building/Assets 13 1 2 7 0.08 0.04
50%
51 Constr of Food Grain storage 13 1 6 5 0.58 0.36
62%
52 Nursery Development 13 1 6 3 0.82 0.61
75%
53 Strengthening of Embankment 13 0 10 0 0.83 0.55
66%
54 Repair & Maint of Bund 12 0 7 4 0.25 0.19
78%
55 Bio-gas plant 9 2 0 0 0.06 0.01
24%
56 Deepening / Desilting of Flood Channels 6 0 3 0 0.08 0.20
230%
57 Construction of Canal 5 0 1 3 0.06 0.00
8%
58 Construction of Embankment 5 1 2 1 0.18 0.07
40%
59 Construction of Village Haats 4 1 0 1 0.06 0.00
2%
60 Piggery Shelter 4 0 0 2 0.03 0.00
4%
61 Repair & Maint of Canal 3 0 0 2 0.10 0.04
37%
62 Lining of Canal 2 0 1 0 0.01 0.01
62%
Total 64,677 3,174 45,990 5,029 671.22 391.39