MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 30,682 830 27,372 120 55.11 48.62
88%
2 Construction of Well 8,445 201 4,555 1,610 159.88 124.19
78%
3 Land Development 6,576 5 5,760 230 45.04 33.35
74%
4 Construction of Check Dam/Stop Dam 2,963 25 1,903 616 85.41 66.19
78%
5 Plantation 2,909 333 1,145 538 52.53 18.11
35%
6 Farm Pond 2,685 147 1,276 382 51.65 25.97
50%
7 Cattle Shed 2,650 1 1,939 243 38.70 28.52
74%
8 Construction of Road and Culvert 2,087 12 1,201 454 114.53 83.62
73%
9 Construction of Trench 1,934 11 1,473 127 64.89 56.73
87%
10 Constr of Cement Concrete Roads 1,828 7 1,026 498 28.06 18.40
66%
11 Well Recharge 1,208 34 546 164 12.74 9.21
72%
12 Construction of Tank 1,131 55 241 152 88.37 66.68
76%
13 Construction of Toilets 818 0 283 328 2.24 0.80
36%
14 Repair & maint of Pond/ Tank 637 46 264 97 37.14 30.22
81%
15 Construction of Bund 599 10 166 205 14.94 8.58
57%
16 Construction of Percolation Tank 529 8 261 142 42.54 29.69
70%
17 Construction of NADEP/Vermi Compost Pit 511 4 130 221 1.10 0.41
37%
18 Construction of Recharge Pits 491 3 167 67 7.28 5.69
78%
19 Construction of Crematorium 288 2 220 25 6.45 5.17
80%
20 Solid and Liquid Waste Management 263 1 11 176 0.43 0.06
14%
21 Construction of Play field 210 3 125 21 5.31 3.20
60%
22 Constr of Compound wall 199 1 50 99 11.35 6.22
55%
23 Construction of Canal 165 33 6 3 4.39 2.48
57%
24 Constr of GP Bhawan 162 5 54 60 8.64 5.00
58%
25 Constr of Aganwadi 130 3 81 33 3.14 2.21
70%
26 Culvert 126 0 102 12 0.49 3.15
648%
27 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 124 1 15 76 0.71 0.38
54%
28 Repair & maint of Road 110 2 57 31 3.08 2.35
76%
29 Boulder Check/Gully Plug 77 0 32 31 0.87 0.62
71%
30 Renovation of traditional water bodies 74 0 64 0 3.42 3.38
99%
31 Terracing 72 0 19 30 1.50 1.08
72%
32 Community Sanitary Complex 69 0 33 21 0.24 0.14
60%
33 Repair & Maint of Check Dam/Stop Dam 40 1 16 13 1.76 1.48
84%
34 Grass Land Development 30 2 8 12 1.53 0.81
53%
35 Underground Dyke for Ground Water Recharge 29 0 12 2 0.45 0.70
157%
36 Constr of Gabion 29 0 10 10 0.40 0.30
74%
37 Repair & maint of Percolation Tank 26 1 9 12 0.57 0.31
54%
38 Repair & Maint of Community infrastructure 23 0 6 12 1.40 0.72
51%
39 Constr of Food Grain storage 22 0 6 6 0.31 0.29
95%
40 Repair & Maint of Bund 19 0 3 4 0.62 0.44
71%
41 Construction of building/workshed for SHG 18 1 5 4 0.20 0.18
90%
42 Bio-Fertilizer 18 0 6 6 0.63 0.49
78%
43 Constr of Kitchen Shed 17 0 0 14 0.14 0.13
93%
44 Nursery Development 17 0 1 7 0.13 0.01
9%
45 Roof Water Harvesting on gov/panchayat bldg 15 0 2 6 0.04 0.03
66%
46 Other Works 14 0 3 7 0.54 0.20
37%
47 Construction of Spur 13 0 1 5 0.23 0.10
42%
48 Lining of Canal 9 0 1 1 0.09 0.05
52%
49 Goat Shelter 9 0 3 1 0.09 0.04
45%
50 Repaire and Maint of NADEP/Vermi Compost Pit 9 0 0 8 0.01 0.00
0%
51 Construction of Fish Drying Infrastructure 7 0 1 0 0.03 0.02
49%
52 Construction of Other Community Building/Assets 5 0 0 3 0.00 0.00
0%
53 Works for Flood Control and Protection 4 0 1 0 0.06 0.04
69%
54 Renovation of Canal 4 0 0 0 0.05 0.04
96%
55 Repair & maint of Water Harvesting Structures 4 0 1 1 0.13 0.01
8%
56 Bio-gas plant 4 0 0 1 0.04 0.00
0%
57 Deepening / Desilting of Flood Channels 3 0 1 0 0.07 0.00
2%
58 Poultry Shelter 3 0 1 1 0.03 0.03
93%
59 Piggery Shelter 2 0 0 2 0.02 0.00
0%
60 Repair & maint of Gully Plugs 2 0 2 0 0.11 0.08
78%
61 Construction of Village Haats 1 0 0 1 0.00 0.00
0%
62 Lift Irrigation 1 0 0 0 0.02 0.00
0%
Total 71,149 1,788 50,676 6,951 961.85 696.90
All 62 rows (zero-value rows hidden) ⇩ Export to Excel