MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 25,948 1,237 21,519 18 47.62 39.88
84%
2 Constr of Cement Concrete Roads 3,163 77 2,477 246 27.46 14.94
54%
3 Plantation 3,113 188 1,936 486 65.40 11.25
17%
4 Land Development 3,022 2 2,240 362 15.89 6.80
43%
5 Construction of NADEP/Vermi Compost Pit 2,860 7 1,639 1,066 5.29 3.34
63%
6 Construction of Toilets 2,302 0 1,862 9 1.34 0.97
72%
7 Construction of Bund 2,297 1 1,384 730 8.70 4.81
55%
8 Solid and Liquid Waste Management 1,214 9 569 525 2.17 1.39
64%
9 Construction of Road and Culvert 1,162 30 858 121 69.97 38.86
56%
10 Farm Pond 1,124 6 674 279 15.21 6.81
45%
11 Construction of Check Dam/Stop Dam 676 6 370 218 13.81 8.47
61%
12 Construction of Well 623 19 466 48 10.54 6.06
58%
13 Construction of Recharge Pits 342 1 149 145 0.89 0.42
47%
14 Well Recharge 284 1 122 76 0.98 0.54
55%
15 Repaire and Maint of NADEP/Vermi Compost Pit 278 0 166 88 0.62 0.48
77%
16 Construction of Trench 254 1 109 55 2.76 1.41
51%
17 Construction of Tank 245 1 101 99 7.85 4.03
51%
18 Repair & maint of Pond/ Tank 209 3 98 76 3.70 1.88
51%
19 Construction of Play field 189 2 122 23 3.78 1.59
42%
20 Cattle Shed 167 1 63 84 3.16 2.62
83%
21 Boulder Check/Gully Plug 146 1 45 88 1.12 0.68
61%
22 Construction of Crematorium 134 3 101 25 2.27 1.75
77%
23 Terracing 119 0 52 62 0.88 0.53
60%
24 Other Works 111 0 92 16 0.39 0.27
69%
25 Construction of Percolation Tank 99 1 51 38 0.66 0.22
34%
26 Renovation of traditional water bodies 99 0 76 6 1.98 0.87
44%
27 Repair & Maint of Canal 93 2 70 19 0.49 0.36
72%
28 Repair & maint of Road 89 0 60 17 1.82 1.44
79%
29 Works for Flood Control and Protection 87 4 52 20 1.26 0.68
54%
30 Constr of GP Bhawan 79 8 50 16 6.21 4.20
68%
31 Repair & Maint of Bund 79 0 47 30 0.83 0.27
33%
32 Repair & Maint of Community infrastructure 76 0 62 5 1.61 0.94
58%
33 Repair & maint of Water Harvesting Structures 75 1 45 29 1.09 0.65
60%
34 Community Sanitary Complex 72 5 54 5 0.28 0.24
86%
35 Constr of Aganwadi 69 4 43 10 1.56 1.22
78%
36 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 63 1 31 16 0.54 0.32
59%
37 Repair & Maint of Check Dam/Stop Dam 61 0 33 21 1.14 0.85
75%
38 Roof Water Harvesting on gov/panchayat bldg 60 1 19 31 0.31 0.17
56%
39 Goat Shelter 57 0 12 23 0.06 0.04
76%
40 Constr of Gabion 55 2 29 18 0.34 0.22
63%
41 Renovation of Canal 40 0 27 12 0.26 0.16
60%
42 Construction of Canal 37 1 22 14 0.17 0.11
64%
43 Culvert 33 4 14 2 0.31 0.05
17%
44 Grass Land Development 23 0 13 4 0.42 0.13
32%
45 Nursery Development 22 0 5 7 0.29 0.02
8%
46 Strengthening of Embankment 21 0 21 0 0.38 0.17
44%
47 Construction of Fish Drying Infrastructure 19 0 7 7 0.29 0.13
46%
48 Constr of Food Grain storage 18 3 2 9 0.66 0.48
73%
49 Bio-Fertilizer 17 0 10 2 0.12 0.05
41%
50 Construction of Embankment 16 1 7 5 0.17 0.11
62%
51 Underground Dyke for Ground Water Recharge 16 0 4 12 0.06 0.02
36%
52 Constr of Compound wall 12 2 8 0 0.13 0.08
60%
53 Construction of Other Community Building/Assets 12 0 11 1 0.12 0.01
9%
54 Deepening / Desilting of Flood Channels 11 0 8 0 0.36 0.07
20%
55 Constr of Kitchen Shed 10 0 1 9 0.01 0.00
17%
56 Construction of Spur 9 0 2 7 0.07 0.02
30%
57 Poultry Shelter 7 2 0 4 0.05 0.01
11%
58 Construction of building/workshed for SHG 7 0 4 0 0.08 0.06
82%
59 Repair & maint of Percolation Tank 6 0 3 2 0.11 0.03
27%
60 Lining of Canal 4 0 1 3 0.02 0.01
43%
61 Piggery Shelter 3 0 2 1 0.29 0.28
94%
62 Bio-gas plant 2 0 0 0 0.00 0.00
0%
63 Construction of Village Haats 1 0 0 1 0.00 0.00
0%
Total 51,541 1,638 38,120 5,351 336.33 174.47
All 63 rows (zero-value rows hidden) ⇩ Export to Excel