MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Farm Pond 15,910 83 13,803 334 101.64 70.56
69%
2 Rural Housing 12,934 456 12,307 50 24.67 22.66
92%
3 Land Development 5,628 4 3,790 1,101 45.29 23.49
52%
4 Construction of Check Dam/Stop Dam 2,800 32 2,257 265 119.22 22.75
19%
5 Plantation 2,499 312 1,543 369 46.97 15.04
32%
6 Construction of Bund 1,637 1 856 521 12.01 9.06
75%
7 Construction of Well 1,431 74 761 186 23.02 14.23
62%
8 Construction of NADEP/Vermi Compost Pit 940 19 407 455 1.57 1.03
66%
9 Constr of Cement Concrete Roads 698 5 480 57 10.59 4.30
41%
10 Constr of Gabion 644 10 310 270 8.84 6.49
74%
11 Construction of Road and Culvert 492 3 299 58 29.29 13.60
46%
12 Construction of Percolation Tank 464 1 280 124 11.97 8.38
70%
13 Cattle Shed 410 9 141 126 2.16 1.11
51%
14 Construction of Toilets 292 0 48 0 0.09 0.01
11%
15 Construction of Trench 291 6 185 64 8.87 6.86
77%
16 Well Recharge 225 12 131 39 1.94 1.32
68%
17 Solid and Liquid Waste Management 214 6 62 106 0.68 0.28
41%
18 Repair & maint of Pond/ Tank 136 0 63 57 3.73 2.97
80%
19 Boulder Check/Gully Plug 121 0 60 48 0.82 0.70
86%
20 Terracing 117 1 77 30 2.79 2.34
84%
21 Renovation of traditional water bodies 103 0 68 4 4.61 2.11
46%
22 Repair & Maint of Check Dam/Stop Dam 90 0 36 44 1.29 0.93
72%
23 Repair & maint of Water Harvesting Structures 89 2 39 40 1.81 1.37
76%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 84 4 41 28 3.18 2.33
73%
25 Construction of Tank 80 6 22 40 6.97 5.26
76%
26 Repaire and Maint of NADEP/Vermi Compost Pit 79 0 39 38 0.20 0.11
53%
27 Construction of Recharge Pits 78 0 26 17 0.67 0.37
55%
28 Goat Shelter 73 1 13 34 0.12 0.06
54%
29 Poultry Shelter 53 0 21 19 0.15 0.10
70%
30 Construction of Crematorium 39 0 33 2 0.93 0.65
70%
31 Constr of Aganwadi 38 1 22 8 0.85 0.62
73%
32 Community Sanitary Complex 35 0 26 8 0.13 0.11
86%
33 Works for Flood Control and Protection 34 0 24 6 0.87 0.76
87%
34 Repair & maint of Road 30 0 5 1 0.86 0.62
72%
35 Construction of Play field 25 0 19 1 0.59 0.37
62%
36 Culvert 23 1 4 14 0.74 0.70
95%
37 Constr of GP Bhawan 17 3 9 0 1.84 1.37
75%
38 Other Works 14 2 4 6 0.13 0.04
30%
39 Repair & Maint of Community infrastructure 14 1 11 1 0.42 0.26
62%
40 Constr of Food Grain storage 14 0 9 0 0.76 0.24
32%
41 Roof Water Harvesting on gov/panchayat bldg 9 0 4 2 0.19 0.16
86%
42 Construction of Spur 9 0 4 3 0.19 0.07
38%
43 Lining of Canal 9 0 5 1 1.23 0.14
11%
44 Repair & Maint of Bund 8 0 3 2 0.10 0.09
91%
45 Construction of Canal 8 0 5 1 0.22 0.20
91%
46 Nursery Development 5 0 1 2 0.07 0.04
58%
47 Deepening / Desilting of Flood Channels 4 0 3 0 0.66 0.06
9%
48 Grass Land Development 4 0 2 2 0.09 0.05
51%
49 Construction of Embankment 4 0 2 2 0.07 0.06
80%
50 Bio-Fertilizer 4 0 1 0 0.02 0.00
1%
51 Lift Irrigation 3 0 1 0 0.35 0.00
1%
52 Piggery Shelter 3 0 1 2 0.00 0.00
92%
53 Repair & maint of Percolation Tank 3 0 0 3 0.00 0.00
0%
54 Renovation of Canal 3 0 2 0 0.04 0.04
93%
55 Underground Dyke for Ground Water Recharge 3 0 1 2 0.01 0.00
15%
56 Repair & Maint of Canal 2 0 2 0 0.08 0.07
88%
57 Construction of building/workshed for SHG 2 0 0 1 0.02 0.00
0%
58 Construction of Fish Drying Infrastructure 2 0 1 1 0.00 0.02
0%
59 Construction of Village Haats 1 0 1 0 0.06 0.05
83%
60 Construction of Other Community Building/Assets 1 0 0 0 0.09 0.00
0%
61 Constr of Kitchen Shed 1 0 0 1 0.00 0.00
0%
Total 48,983 1,055 38,370 4,596 486.74 246.61
All 61 rows (zero-value rows hidden) ⇩ Export to Excel