MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 12,674 710 11,505 29 25.08 22.36
89%
2 Plantation 3,385 263 2,124 453 38.90 14.60
38%
3 Farm Pond 2,822 9 1,962 14 22.18 9.79
44%
4 Land Development 2,471 5 2,009 56 22.84 13.49
59%
5 Construction of Toilets 1,970 0 1,367 164 5.29 1.42
27%
6 Constr of Cement Concrete Roads 1,464 0 1,088 168 13.73 9.63
70%
7 Construction of Bund 1,366 2 634 370 19.94 13.73
69%
8 Construction of Road and Culvert 1,338 0 860 158 61.86 42.81
69%
9 Cattle Shed 1,198 1 823 94 13.51 7.79
58%
10 Construction of Check Dam/Stop Dam 1,108 2 795 132 21.82 17.45
80%
11 Well Recharge 1,066 7 388 114 10.26 6.20
60%
12 Construction of Trench 1,054 6 610 161 30.36 21.59
71%
13 Construction of Well 767 73 312 117 11.30 7.08
63%
14 Construction of NADEP/Vermi Compost Pit 618 5 171 177 1.60 0.46
29%
15 Goat Shelter 444 1 256 34 12.51 1.02
8%
16 Solid and Liquid Waste Management 332 3 40 74 0.49 0.25
52%
17 Construction of Recharge Pits 225 0 49 56 2.08 1.39
67%
18 Repair & maint of Pond/ Tank 196 0 92 52 4.35 3.21
74%
19 Construction of Tank 155 4 36 62 6.19 3.57
58%
20 Construction of Crematorium 136 7 63 25 2.41 1.63
68%
21 Construction of Percolation Tank 114 4 40 29 6.01 4.84
81%
22 Boulder Check/Gully Plug 112 0 50 32 2.10 1.52
73%
23 Terracing 111 0 55 29 3.32 2.44
74%
24 Constr of GP Bhawan 109 5 44 39 2.27 1.68
74%
25 Constr of Aganwadi 108 2 56 22 1.77 1.34
75%
26 Renovation of traditional water bodies 105 0 79 6 3.24 2.27
70%
27 Repair & maint of Water Harvesting Structures 92 1 43 17 2.35 1.61
69%
28 Repair & maint of Road 86 1 35 32 1.27 1.01
80%
29 Constr of Compound wall 83 3 37 31 1.40 0.88
63%
30 Constr of Food Grain storage 78 1 26 34 1.82 1.19
66%
31 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 71 1 38 22 1.88 1.43
76%
32 Roof Water Harvesting on gov/panchayat bldg 67 1 12 21 1.08 0.51
47%
33 Construction of Play field 64 0 45 6 1.74 1.26
73%
34 Culvert 64 0 24 25 2.37 1.70
72%
35 Other Works 55 0 29 14 0.42 0.32
77%
36 Underground Dyke for Ground Water Recharge 54 0 44 0 1.36 1.08
79%
37 Poultry Shelter 53 0 19 7 0.29 0.13
45%
38 Repair & Maint of Check Dam/Stop Dam 46 1 16 16 1.03 0.59
58%
39 Grass Land Development 36 0 21 8 0.82 0.39
47%
40 Repair & Maint of Bund 36 0 10 21 0.73 0.43
59%
41 Constr of Gabion 33 1 11 9 0.42 0.34
79%
42 Repair & Maint of Community infrastructure 32 1 7 14 0.43 0.30
69%
43 Community Sanitary Complex 26 2 12 9 0.65 0.06
9%
44 Bio-Fertilizer 25 0 10 12 0.26 0.24
90%
45 Constr of Kitchen Shed 23 0 0 21 0.02 0.00
0%
46 Construction of Other Community Building/Assets 21 2 11 5 0.41 0.31
75%
47 Bio-gas plant 21 5 1 0 0.07 0.04
61%
48 Construction of building/workshed for SHG 20 0 2 16 0.10 0.04
42%
49 Nursery Development 19 1 4 6 0.27 0.08
29%
50 Piggery Shelter 13 0 3 5 0.14 0.06
42%
51 Works for Flood Control and Protection 12 0 7 5 0.28 0.21
75%
52 Repair & maint of Percolation Tank 11 0 6 5 0.24 0.19
78%
53 Repaire and Maint of NADEP/Vermi Compost Pit 11 0 0 11 0.01 0.00
0%
54 Construction of Canal 10 0 1 3 0.15 0.08
53%
55 Construction of Spur 8 0 6 2 0.26 0.22
86%
56 Construction of Village Haats 7 0 1 4 0.02 0.02
88%
57 Lining of Canal 7 0 2 0 0.98 0.76
78%
58 Construction of Embankment 6 0 2 0 0.16 0.13
80%
59 Construction of Fish Drying Infrastructure 6 0 0 3 0.01 0.00
0%
60 Renovation of Canal 4 0 0 0 0.00 0.00
0%
61 Repair & maint of Gully Plugs 2 0 0 1 0.08 0.00
5%
62 Lift Irrigation 2 0 0 0 0.00 0.00
0%
63 (uncategorised) 1 0 0 0 0.00 0.00
0%
Total 36,653 1,130 25,993 3,052 368.97 229.17
All 63 rows (zero-value rows hidden) ⇩ Export to Excel