MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 30,238 2,720 23,541 379 60.44 44.90
74%
2 Constr of Cement Concrete Roads 3,737 36 2,102 1,089 54.24 43.67
81%
3 Construction of NADEP/Vermi Compost Pit 3,587 7 1,552 1,174 4.09 1.23
30%
4 Plantation 3,586 151 1,229 1,396 46.60 21.13
45%
5 Construction of Check Dam/Stop Dam 3,437 32 1,292 1,677 73.62 53.92
73%
6 Cattle Shed 3,082 33 1,410 628 25.34 10.65
42%
7 Construction of Bund 2,722 6 798 1,357 47.95 32.01
67%
8 Construction of Road and Culvert 2,644 13 1,495 501 56.84 54.65
96%
9 Construction of Toilets 1,934 4 1,206 164 3.25 1.33
41%
10 Land Development 1,151 4 544 229 29.65 22.87
77%
11 Farm Pond 950 16 558 42 7.69 8.08
105%
12 Construction of Recharge Pits 835 5 195 481 1.61 0.86
53%
13 Construction of Tank 558 17 121 191 14.64 9.31
64%
14 Construction of Trench 552 4 240 201 10.68 7.13
67%
15 Boulder Check/Gully Plug 497 1 231 200 6.20 4.49
72%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 478 3 222 168 9.60 7.57
79%
17 Culvert 438 4 246 132 14.39 12.44
87%
18 Works for Flood Control and Protection 414 23 159 189 13.18 8.60
65%
19 Roof Water Harvesting on gov/panchayat bldg 292 0 69 119 1.37 0.95
70%
20 Repair & maint of Pond/ Tank 277 2 77 117 3.80 2.63
69%
21 Terracing 250 0 64 161 2.75 1.79
65%
22 Construction of Canal 245 6 98 55 1.87 0.98
53%
23 Constr of GP Bhawan 233 9 77 110 9.08 4.64
51%
24 Well Recharge 232 0 77 110 0.61 0.24
40%
25 Solid and Liquid Waste Management 227 6 61 106 1.61 0.89
55%
26 Repair & maint of Road 215 2 102 86 6.35 4.95
78%
27 Construction of Percolation Tank 213 0 68 81 3.19 2.05
64%
28 Constr of Aganwadi 209 11 98 72 4.22 2.26
54%
29 Construction of Crematorium 187 2 120 28 6.07 4.31
71%
30 Repair & Maint of Community infrastructure 187 3 128 32 2.99 2.51
84%
31 Repair & maint of Water Harvesting Structures 183 1 62 106 2.64 1.85
70%
32 Constr of Gabion 175 0 39 109 1.79 1.11
62%
33 Repair & Maint of Check Dam/Stop Dam 142 0 46 69 3.03 1.94
64%
34 Constr of Food Grain storage 141 2 27 57 2.28 1.23
54%
35 Repair & Maint of Bund 135 1 54 61 2.95 1.93
65%
36 Community Sanitary Complex 129 22 71 21 0.72 0.36
50%
37 Construction of Spur 128 5 53 55 3.13 2.46
79%
38 Construction of Play field 125 0 70 24 6.14 4.57
74%
39 Constr of Compound wall 105 5 59 25 4.78 3.68
77%
40 Other Works 69 0 14 46 0.89 0.58
66%
41 Construction of Well 62 1 22 13 0.77 0.28
37%
42 Lining of Canal 41 0 20 9 0.32 0.22
67%
43 Repair & maint of Percolation Tank 40 2 9 22 0.38 0.18
48%
44 Repaire and Maint of NADEP/Vermi Compost Pit 39 0 5 17 0.18 0.07
38%
45 Bio-Fertilizer 38 0 5 14 1.00 0.52
52%
46 Goat Shelter 37 1 3 26 0.54 0.40
74%
47 Underground Dyke for Ground Water Recharge 28 0 13 2 0.56 0.37
66%
48 Construction of building/workshed for SHG 25 1 3 10 0.66 0.23
34%
49 Renovation of Canal 25 0 9 1 0.48 0.22
46%
50 Renovation of traditional water bodies 21 0 4 12 0.59 0.06
10%
51 Constr of Kitchen Shed 20 0 4 14 0.12 0.06
48%
52 Poultry Shelter 20 0 6 7 0.56 0.15
26%
53 Grass Land Development 18 0 4 9 0.45 0.05
12%
54 Construction of Other Community Building/Assets 16 0 8 8 0.48 0.45
93%
55 Construction of Embankment 15 2 4 3 0.31 0.24
79%
56 Nursery Development 13 0 3 2 0.32 0.17
53%
57 Piggery Shelter 6 0 2 3 0.05 0.04
77%
58 Strengthening of Embankment 4 0 3 0 0.00 0.01
0%
59 Deepening / Desilting of Flood Channels 3 0 1 0 0.15 0.05
34%
60 Repair & Maint of Canal 3 0 0 3 0.00 0.00
0%
61 Construction of Village Haats 2 1 0 0 0.02 0.02
86%
62 Repair & maint of Gully Plugs 1 0 0 1 0.00 0.00
0%
63 Bio-gas plant 1 0 0 0 0.00 0.00
0%
64 Construction of Fish Drying Infrastructure 1 0 1 0 0.09 0.09
100%
Total 65,418 3,164 38,804 12,024 560.33 396.62
All 64 rows (zero-value rows hidden) ⇩ Export to Excel