MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
to
Reset filters
Scope
Works completed
336
Sanctioned (pure scheme)
₹8.80 Cr
Expenditure since inception
₹7.25 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
16 works
₹2.05 Cr sanctioned
₹1.57 Cr spent (77%)
02
Works for Flood Control and Protection
9 works
₹1.48 Cr sanctioned
₹1.18 Cr spent (80%)
03
Terracing
5 works
₹74.46 L sanctioned
₹62.85 L spent (84%)
04
Construction of Check Dam/Stop Dam
5 works
₹68.68 L sanctioned
₹63.88 L spent (93%)
05
Rural Housing
239 works
₹48.91 L sanctioned
₹42.78 L spent (87%)
06
Cattle Shed
14 works
₹48.25 L sanctioned
₹42.50 L spent (88%)
07
Construction of Road and Culvert
12 works
₹47.00 L sanctioned
₹40.32 L spent (86%)
08
Repair & maint of Water Harvesting Structures
4 works
₹32.22 L sanctioned
₹24.20 L spent (75%)
09
Construction of Bund
2 works
₹29.74 L sanctioned
₹29.33 L spent (99%)
10
Repair & maint of Percolation Tank
3 works
₹29.57 L sanctioned
₹27.13 L spent (92%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 239 0.49 0.43
88%
2 Plantation 16 2.05 1.57
77%
3 Cattle Shed 14 0.48 0.42
88%
4 Construction of Road and Culvert 12 0.47 0.40
86%
5 Works for Flood Control and Protection 9 1.48 1.18
80%
6 Well Recharge 7 0.02 0.01
48%
7 Constr of Cement Concrete Roads 6 0.06 0.04
62%
8 Construction of Check Dam/Stop Dam 5 0.69 0.64
93%
9 Terracing 5 0.74 0.63
84%
10 Repair & maint of Water Harvesting Structures 4 0.32 0.24
75%
11 Repair & Maint of Community infrastructure 3 0.19 0.14
75%
12 Repair & maint of Percolation Tank 3 0.30 0.27
92%
13 Boulder Check/Gully Plug 2 0.20 0.19
96%
14 Construction of Bund 2 0.30 0.29
99%
15 Construction of Tank 2 0.29 0.21
70%
16 Land Development 2 0.05 0.05
88%
17 Deepening / Desilting of Flood Channels 1 0.15 0.07
49%
18 Renovation of traditional water bodies 1 0.03 0.01
53%
19 Construction of Trench 1 0.15 0.14
95%
20 Repair & maint of Pond/ Tank 1 0.25 0.23
92%
21 Construction of Percolation Tank 1 0.10 0.08
85%
Total 336 8.80 7.25
All 21 rows (zero-value rows hidden) ⇩ Export to Excel