MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
to
Reset filters
Scope
Works completed
132
Sanctioned (pure scheme)
₹10.14 Cr
Expenditure since inception
₹8.86 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
14 works
₹2.09 Cr sanctioned
₹1.85 Cr spent (88%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹1.03 Cr sanctioned
₹95.72 L spent (93%)
03
Construction of Percolation Tank
6 works
₹98.85 L sanctioned
₹87.00 L spent (88%)
04
Works for Flood Control and Protection
10 works
₹84.49 L sanctioned
₹65.71 L spent (78%)
05
Construction of Check Dam/Stop Dam
9 works
₹80.23 L sanctioned
₹70.26 L spent (88%)
06
Construction of Road and Culvert
9 works
₹65.62 L sanctioned
₹57.69 L spent (88%)
07
Construction of Trench
5 works
₹64.40 L sanctioned
₹60.56 L spent (94%)
08
Farm Pond
21 works
₹59.90 L sanctioned
₹51.33 L spent (86%)
09
Terracing
3 works
₹54.32 L sanctioned
₹51.79 L spent (95%)
10
Repair & maint of Road
2 works
₹52.40 L sanctioned
₹49.69 L spent (95%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 21 0.60 0.51
86%
2 Construction of Tank 14 2.09 1.85
88%
3 Rural Housing 12 0.02 0.02
81%
4 Works for Flood Control and Protection 10 0.84 0.66
78%
5 Construction of Check Dam/Stop Dam 9 0.80 0.70
88%
6 Construction of Road and Culvert 9 0.66 0.58
88%
7 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 7 1.03 0.96
93%
8 Land Development 6 0.05 0.03
71%
9 Construction of Percolation Tank 6 0.99 0.87
88%
10 Construction of Trench 5 0.64 0.61
94%
11 Well Recharge 5 0.01 0.01
53%
12 Cattle Shed 4 0.03 0.01
36%
13 Terracing 3 0.54 0.52
95%
14 Construction of Bund 3 0.39 0.34
86%
15 Plantation 3 0.22 0.10
47%
16 Constr of Cement Concrete Roads 3 0.01 0.02
132%
17 Construction of Recharge Pits 2 0.30 0.28
95%
18 Repair & maint of Road 2 0.52 0.50
95%
19 Boulder Check/Gully Plug 2 0.14 0.12
86%
20 Construction of Crematorium 1 0.02 0.02
98%
21 Construction of Canal 1 0.07 0.06
86%
22 Constr of GP Bhawan 1 0.15 0.09
64%
23 Repair & maint of Pond/ Tank 1 0.01 0.01
95%
24 Community Sanitary Complex 1 0.00 0.00
97%
25 Strengthening of Embankment 1 0.00 0.00
0%
Total 132 10.14 8.86
All 25 rows (zero-value rows hidden) ⇩ Export to Excel