Showcase — Completed Works

Rollup last refreshed: 2026-10-01 08:37:11.749328
to
to
Reset filters
Scope
Works completed
245
Sanctioned (pure scheme)
₹5.80 Cr
Expenditure since inception
₹4.82 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
40 works
₹1.13 Cr sanctioned
₹98.86 L spent (88%)
02
Construction of Road and Culvert
10 works
₹92.86 L sanctioned
₹72.78 L spent (78%)
03
Repair & maint of Water Harvesting Structures
7 works
₹48.68 L sanctioned
₹60.52 L spent (124%)
04
Construction of Percolation Tank
21 works
₹37.48 L sanctioned
₹35.96 L spent (96%)
05
Culvert
5 works
₹36.48 L sanctioned
₹29.75 L spent (82%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹29.28 L sanctioned
₹24.53 L spent (84%)
07
Construction of Tank
18 works
₹24.46 L sanctioned
₹18.21 L spent (74%)
08
Constr of Cement Concrete Roads
17 works
₹24.45 L sanctioned
₹19.19 L spent (78%)
09
Deepening / Desilting of Flood Channels
1 works
₹23.79 L sanctioned
₹7.29 L spent (31%)
10
Construction of Well
8 works
₹22.64 L sanctioned
₹14.50 L spent (64%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Toilets 40 0.02 0.02
95%
2 Construction of Check Dam/Stop Dam 40 1.13 0.99
88%
3 Rural Housing 37 0.06 0.06
99%
4 Construction of Percolation Tank 21 0.37 0.36
96%
5 Construction of Tank 18 0.24 0.18
74%
6 Constr of Cement Concrete Roads 17 0.24 0.19
79%
7 Construction of Road and Culvert 10 0.93 0.73
78%
8 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 10 0.29 0.25
84%
9 Construction of Well 8 0.23 0.15
64%
10 Repair & maint of Water Harvesting Structures 7 0.49 0.61
124%
11 Land Development 6 0.16 0.12
72%
12 Well Recharge 5 0.03 0.00
10%
13 Culvert 5 0.36 0.30
82%
14 Plantation 5 0.19 0.08
41%
15 Construction of Trench 3 0.12 0.12
98%
16 Construction of Bund 3 0.16 0.13
83%
17 Construction of Fish Drying Infrastructure 3 0.15 0.13
91%
18 Construction of NADEP/Vermi Compost Pit 2 0.02 0.02
94%
19 Constr of GP Bhawan 1 0.13 0.10
80%
20 Construction of Play field 1 0.15 0.14
94%
21 Constr of Aganwadi 1 0.05 0.05
100%
22 Deepening / Desilting of Flood Channels 1 0.24 0.07
31%
23 Terracing 1 0.04 0.04
97%
Total 245 5.80 4.82