MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-10-22 07:06:18.046564
to
to
Reset filters
Scope
Works completed
264
Sanctioned (pure scheme)
₹3.39 Cr
Expenditure since inception
₹2.72 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
24 works
₹44.34 L sanctioned
₹36.93 L spent (83%)
02
Construction of Road and Culvert
9 works
₹43.39 L sanctioned
₹31.59 L spent (73%)
03
Construction of Well
13 works
₹37.80 L sanctioned
₹27.68 L spent (73%)
04
Deepening / Desilting of Flood Channels
6 works
₹36.73 L sanctioned
₹29.91 L spent (81%)
05
Renovation of traditional water bodies
13 works
₹31.53 L sanctioned
₹24.43 L spent (77%)
06
Construction of Check Dam/Stop Dam
5 works
₹22.58 L sanctioned
₹23.95 L spent (106%)
07
Rural Housing
124 works
₹21.51 L sanctioned
₹19.51 L spent (91%)
08
Constr of Cement Concrete Roads
19 works
₹16.84 L sanctioned
₹11.27 L spent (67%)
09
Plantation
4 works
₹14.52 L sanctioned
₹6.83 L spent (47%)
10
Construction of Bund
22 works
₹13.47 L sanctioned
₹11.97 L spent (89%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 124 21.51 19.51
91%
2 Farm Pond 24 44.34 36.93
83%
3 Construction of Bund 22 13.47 11.97
89%
4 Constr of Cement Concrete Roads 19 16.84 11.27
67%
5 Renovation of traditional water bodies 13 31.53 24.43
78%
6 Construction of Well 13 37.80 27.68
73%
7 Construction of Road and Culvert 9 43.39 31.59
73%
8 Construction of Toilets 7 0.38 0.38
100%
9 Deepening / Desilting of Flood Channels 6 36.73 29.91
81%
10 Construction of Check Dam/Stop Dam 5 22.58 23.95
106%
11 Plantation 4 14.52 6.83
47%
12 Repair & maint of Water Harvesting Structures 3 5.97 5.83
98%
13 Constr of Gabion 3 6.83 6.57
96%
14 Works for Flood Control and Protection 2 9.19 7.24
79%
15 Constr of GP Bhawan 2 0.88 0.78
89%
16 Land Development 2 3.65 2.42
66%
17 Construction of Trench 1 4.54 4.48
99%
18 Construction of Crematorium 1 1.80 1.81
101%
19 Repair & Maint of Community infrastructure 1 12.85 9.95
77%
20 Repair & maint of Pond/ Tank 1 4.52 4.32
96%
21 Construction of Percolation Tank 1 1.10 0.06
5%
22 Construction of Tank 1 4.76 4.36
92%
Total 264 339.17 272.26
All 22 rows (zero-value rows hidden) ⇩ Export to Excel