Showcase — Completed Works

Rollup last refreshed: 2026-10-01 08:37:11.749328
to
to
Reset filters
Scope
Works completed
326
Sanctioned (pure scheme)
₹4.36 Cr
Expenditure since inception
₹3.22 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
10 works
₹92.39 L sanctioned
₹84.38 L spent (91%)
02
Construction of Road and Culvert
5 works
₹47.26 L sanctioned
₹33.13 L spent (70%)
03
Plantation
11 works
₹44.88 L sanctioned
₹24.77 L spent (55%)
04
Construction of Bund
24 works
₹36.22 L sanctioned
₹26.63 L spent (74%)
05
Farm Pond
27 works
₹28.46 L sanctioned
₹22.28 L spent (78%)
06
Rural Housing
152 works
₹27.09 L sanctioned
₹25.41 L spent (94%)
07
Land Development
35 works
₹24.15 L sanctioned
₹9.75 L spent (40%)
08
Construction of Recharge Pits
5 works
₹23.16 L sanctioned
₹11.74 L spent (51%)
09
Construction of Percolation Tank
3 works
₹22.65 L sanctioned
₹18.48 L spent (82%)
10
Construction of Check Dam/Stop Dam
4 works
₹19.83 L sanctioned
₹16.75 L spent (85%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 152 27.09 25.41
94%
2 Land Development 35 24.15 9.75
40%
3 Construction of Well 28 17.93 14.87
83%
4 Farm Pond 27 28.46 22.28
78%
5 Construction of Bund 24 36.22 26.63
74%
6 Plantation 11 44.88 24.77
55%
7 Construction of Trench 10 92.39 84.38
91%
8 Construction of Recharge Pits 5 23.16 11.74
51%
9 Construction of Road and Culvert 5 47.26 33.13
70%
10 Construction of Check Dam/Stop Dam 4 19.83 16.75
85%
11 Construction of Percolation Tank 3 22.65 18.48
82%
12 Cattle Shed 3 1.65 1.38
84%
13 Construction of Tank 3 8.64 6.10
71%
14 Constr of Cement Concrete Roads 2 2.61 2.22
85%
15 Repair & maint of Pond/ Tank 2 9.99 7.13
71%
16 Roof Water Harvesting on gov/panchayat bldg 2 0.66 0.31
47%
17 Solid and Liquid Waste Management 2 1.31 0.75
57%
18 Boulder Check/Gully Plug 1 6.47 4.42
68%
19 Constr of Gabion 1 3.96 1.50
38%
20 Construction of Crematorium 1 2.45 2.37
97%
21 Construction of NADEP/Vermi Compost Pit 1 1.15 0.97
85%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 8.70 2.90
33%
23 Other Works 1 0.47 0.40
86%
24 Repaire and Maint of NADEP/Vermi Compost Pit 1 1.11 0.64
58%
25 Underground Dyke for Ground Water Recharge 1 2.91 2.67
92%
Total 326 436.11 321.95