Showcase — Completed Works

Rollup last refreshed: 2026-10-01 08:37:11.749328
to
to
Reset filters
Scope
Works completed
420
Sanctioned (pure scheme)
₹5.70 Cr
Expenditure since inception
₹4.74 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
90 works
₹1.77 Cr sanctioned
₹1.68 Cr spent (95%)
02
Construction of Check Dam/Stop Dam
61 works
₹1.19 Cr sanctioned
₹96.52 L spent (81%)
03
Construction of Road and Culvert
9 works
₹51.14 L sanctioned
₹45.37 L spent (89%)
04
Plantation
56 works
₹48.26 L sanctioned
₹28.08 L spent (58%)
05
Constr of Cement Concrete Roads
11 works
₹29.71 L sanctioned
₹26.06 L spent (88%)
06
Farm Pond
20 works
₹26.31 L sanctioned
₹14.29 L spent (54%)
07
Construction of Trench
9 works
₹21.55 L sanctioned
₹13.56 L spent (63%)
08
Construction of Bund
10 works
₹21.33 L sanctioned
₹17.50 L spent (82%)
09
Construction of Tank
5 works
₹14.29 L sanctioned
₹11.03 L spent (77%)
10
Repair & maint of Pond/ Tank
4 works
₹11.48 L sanctioned
₹8.80 L spent (77%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Well 90 1.77 1.68
95%
2 Construction of Check Dam/Stop Dam 61 1.19 0.97
81%
3 Construction of Toilets 58 0.04 0.04
92%
4 Plantation 56 0.48 0.28
58%
5 Rural Housing 48 0.08 0.08
98%
6 Farm Pond 20 0.26 0.14
54%
7 Well Recharge 12 0.05 0.04
75%
8 Constr of Cement Concrete Roads 11 0.30 0.26
88%
9 Construction of Bund 10 0.21 0.17
82%
10 Construction of Trench 9 0.22 0.14
63%
11 Construction of Recharge Pits 9 0.02 0.01
62%
12 Construction of Road and Culvert 9 0.51 0.45
89%
13 Land Development 6 0.01 0.01
97%
14 Construction of Tank 5 0.14 0.11
77%
15 Construction of NADEP/Vermi Compost Pit 4 0.00 0.00
80%
16 Repair & maint of Pond/ Tank 4 0.11 0.09
77%
17 Repair & maint of Water Harvesting Structures 2 0.08 0.06
78%
18 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.02 0.02
88%
19 Construction of Crematorium 1 0.02 0.02
100%
20 Construction of Percolation Tank 1 0.09 0.09
99%
21 Poultry Shelter 1 0.01 0.00
91%
22 Renovation of traditional water bodies 1 0.04 0.04
90%
23 Solid and Liquid Waste Management 1 0.02 0.02
89%
Total 420 5.70 4.74
All 23 rows (zero-value rows hidden) ⇩ Export to Excel