MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-26 07:03:36.929547
to
to
Reset filters
Scope
Works completed
792
Sanctioned (pure scheme)
₹6.39 Cr
Expenditure since inception
₹5.26 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
93 works
₹1.22 Cr sanctioned
₹1.04 Cr spent (85%)
02
Farm Pond
329 works
₹1.06 Cr sanctioned
₹90.37 L spent (85%)
03
Construction of Road and Culvert
22 works
₹85.81 L sanctioned
₹45.57 L spent (53%)
04
Construction of Check Dam/Stop Dam
81 works
₹70.86 L sanctioned
₹93.27 L spent (132%)
05
Plantation
15 works
₹44.72 L sanctioned
₹18.14 L spent (41%)
06
Construction of Well
22 works
₹31.85 L sanctioned
₹27.40 L spent (86%)
07
Repair & maint of Pond/ Tank
4 works
₹30.67 L sanctioned
₹26.38 L spent (86%)
08
Rural Housing
125 works
₹23.13 L sanctioned
₹22.26 L spent (96%)
09
Repair & Maint of Check Dam/Stop Dam
1 works
₹18.23 L sanctioned
₹16.10 L spent (88%)
10
Constr of Cement Concrete Roads
12 works
₹16.88 L sanctioned
₹9.04 L spent (54%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 329 1.06 0.90
85%
2 Rural Housing 125 0.23 0.22
96%
3 Construction of Bund 93 1.22 1.04
85%
4 Construction of Check Dam/Stop Dam 81 0.71 0.93
132%
5 Land Development 58 0.17 0.09
54%
6 Construction of Well 22 0.32 0.27
86%
7 Construction of Road and Culvert 22 0.86 0.46
53%
8 Plantation 15 0.45 0.18
41%
9 Constr of Cement Concrete Roads 12 0.17 0.09
54%
10 Constr of Gabion 8 0.16 0.15
94%
11 Works for Flood Control and Protection 4 0.16 0.14
89%
12 Construction of Trench 4 0.07 0.05
63%
13 Repair & maint of Pond/ Tank 4 0.31 0.26
86%
14 Deepening / Desilting of Flood Channels 3 0.06 0.11
182%
15 Well Recharge 2 0.01 0.00
51%
16 Repair & Maint of Check Dam/Stop Dam 1 0.18 0.16
88%
17 Construction of Crematorium 1 0.02 0.02
101%
18 Lining of Canal 1 0.01 0.01
96%
19 Terracing 1 0.03 0.03
84%
20 Construction of Play field 1 0.02 0.02
82%
21 Construction of Percolation Tank 1 0.05 0.04
87%
22 Construction of Fish Drying Infrastructure 1 0.03 0.02
78%
23 Renovation of traditional water bodies 1 0.03 0.02
83%
24 Culvert 1 0.02 0.00
0%
25 Repair & Maint of Canal 1 0.05 0.03
60%
Total 792 6.39 5.26
All 25 rows (zero-value rows hidden) ⇩ Export to Excel