MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-10-01 08:37:11.749328
to
to
Reset filters
Scope
Works completed
362
Sanctioned (pure scheme)
₹3.94 Cr
Expenditure since inception
₹3.33 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
16 works
₹1.16 Cr sanctioned
₹1.03 Cr spent (88%)
02
Plantation
25 works
₹49.14 L sanctioned
₹36.22 L spent (74%)
03
Rural Housing
216 works
₹41.92 L sanctioned
₹41.48 L spent (99%)
04
Land Development
31 works
₹27.62 L sanctioned
₹13.70 L spent (50%)
05
Construction of Bund
7 works
₹27.57 L sanctioned
₹24.38 L spent (88%)
06
Construction of Trench
7 works
₹24.81 L sanctioned
₹21.86 L spent (88%)
07
Construction of Check Dam/Stop Dam
3 works
₹13.25 L sanctioned
₹12.58 L spent (95%)
08
Repair & maint of Pond/ Tank
2 works
₹12.05 L sanctioned
₹10.20 L spent (85%)
09
Culvert
1 works
₹10.38 L sanctioned
₹10.28 L spent (99%)
10
Repair & maint of Water Harvesting Structures
2 works
₹10.19 L sanctioned
₹10.00 L spent (98%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 216 0.42 0.41
99%
2 Land Development 31 0.28 0.14
50%
3 Plantation 25 0.49 0.36
74%
4 Farm Pond 16 0.06 0.06
95%
5 Construction of Road and Culvert 16 1.16 1.03
88%
6 Constr of Cement Concrete Roads 11 0.09 0.06
70%
7 Grass Land Development 9 0.09 0.08
87%
8 Construction of Trench 7 0.25 0.22
88%
9 Construction of Bund 7 0.28 0.24
89%
10 Well Recharge 6 0.02 0.02
100%
11 Construction of Check Dam/Stop Dam 3 0.13 0.13
95%
12 Works for Flood Control and Protection 2 0.09 0.06
64%
13 Repair & maint of Pond/ Tank 2 0.12 0.10
85%
14 Repair & maint of Water Harvesting Structures 2 0.10 0.10
98%
15 Culvert 1 0.10 0.10
99%
16 Construction of Play field 1 0.04 0.03
97%
17 Other Works 1 0.01 0.00
89%
18 Renovation of traditional water bodies 1 0.03 0.03
100%
19 Bio-Fertilizer 1 0.02 0.02
96%
20 Terracing 1 0.07 0.06
88%
21 Underground Dyke for Ground Water Recharge 1 0.05 0.03
71%
22 Construction of Toilets 1 0.00 0.00
97%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.05 0.04
94%
Total 362 3.94 3.33
All 23 rows (zero-value rows hidden) ⇩ Export to Excel