Scope
Works completed
437
Sanctioned (pure scheme)
₹5.48 Cr
Expenditure since inception
₹4.42 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
9 works
₹1.13 Cr sanctioned
₹1.07 Cr spent (94%)
02
Construction of Bund
49 works
₹96.29 L sanctioned
₹79.30 L spent (82%)
03
Plantation
52 works
₹64.90 L sanctioned
₹30.55 L spent (47%)
04
Construction of Road and Culvert
8 works
₹49.03 L sanctioned
₹34.16 L spent (70%)
05
Rural Housing
222 works
₹39.39 L sanctioned
₹38.10 L spent (97%)
06
Construction of Well
13 works
₹31.31 L sanctioned
₹26.12 L spent (83%)
07
Construction of Trench
2 works
₹22.42 L sanctioned
₹14.81 L spent (66%)
08
Farm Pond
13 works
₹20.20 L sanctioned
₹14.46 L spent (72%)
09
Land Development
27 works
₹17.00 L sanctioned
₹14.57 L spent (86%)
10
Constr of Cement Concrete Roads
7 works
₹16.41 L sanctioned
₹15.48 L spent (94%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 222 0.39 0.38
97%
2 Plantation 52 0.65 0.31
47%
3 Construction of Bund 49 0.96 0.79
82%
4 Land Development 27 0.17 0.15
86%
5 Construction of NADEP/Vermi Compost Pit 15 0.02 0.02
93%
6 Farm Pond 13 0.20 0.14
72%
7 Construction of Well 13 0.31 0.26
83%
8 Construction of Check Dam/Stop Dam 9 1.13 1.07
95%
9 Construction of Road and Culvert 8 0.49 0.34
70%
10 Constr of Cement Concrete Roads 7 0.16 0.15
94%
11 Cattle Shed 4 0.04 0.04
94%
12 Renovation of traditional water bodies 4 0.04 0.03
85%
13 Construction of Trench 2 0.22 0.15
66%
14 Repair & maint of Pond/ Tank 2 0.13 0.10
76%
15 Constr of Gabion 2 0.06 0.05
82%
16 Boulder Check/Gully Plug 1 0.03 0.02
81%
17 Construction of Crematorium 1 0.02 0.02
96%
18 Construction of Embankment 1 0.05 0.04
85%
19 Construction of Percolation Tank 1 0.05 0.04
83%
20 Construction of Play field 1 0.03 0.01
42%
21 Construction of Tank 1 0.15 0.14
96%
22 Construction of Toilets 1 0.01 0.01
88%
23 Culvert 1 0.15 0.15
98%
Total 437 5.48 4.42