MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
to
Reset filters
Scope
Works completed
948
Sanctioned (pure scheme)
₹13.43 Cr
Expenditure since inception
₹10.39 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Boulder Check/Gully Plug
76 works
₹3.99 Cr sanctioned
₹3.30 Cr spent (83%)
02
Construction of Check Dam/Stop Dam
164 works
₹2.46 Cr sanctioned
₹1.88 Cr spent (77%)
03
Construction of Road and Culvert
33 works
₹2.17 Cr sanctioned
₹1.74 Cr spent (80%)
04
Plantation
38 works
₹1.33 Cr sanctioned
₹47.97 L spent (36%)
05
Rural Housing
405 works
₹79.61 L sanctioned
₹77.43 L spent (97%)
06
Repair & maint of Water Harvesting Structures
10 works
₹57.11 L sanctioned
₹46.16 L spent (81%)
07
Construction of Bund
51 works
₹50.14 L sanctioned
₹42.32 L spent (84%)
08
Construction of Trench
8 works
₹37.17 L sanctioned
₹30.79 L spent (83%)
09
Farm Pond
78 works
₹33.39 L sanctioned
₹31.02 L spent (93%)
10
Land Development
8 works
₹26.19 L sanctioned
₹24.58 L spent (94%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 405 0.80 0.77
97%
2 Construction of Check Dam/Stop Dam 164 2.46 1.88
77%
3 Farm Pond 78 0.33 0.31
93%
4 Boulder Check/Gully Plug 76 3.99 3.30
83%
5 Construction of Bund 51 0.50 0.42
84%
6 Plantation 38 1.33 0.48
36%
7 Construction of Road and Culvert 33 2.17 1.74
80%
8 Construction of NADEP/Vermi Compost Pit 21 0.04 0.03
72%
9 Constr of Cement Concrete Roads 18 0.20 0.14
71%
10 Solid and Liquid Waste Management 13 0.01 0.00
4%
11 Repair & maint of Water Harvesting Structures 10 0.57 0.46
81%
12 Construction of Percolation Tank 9 0.01 0.01
94%
13 Construction of Trench 8 0.37 0.31
83%
14 Land Development 8 0.26 0.25
94%
15 Repair & Maint of Check Dam/Stop Dam 4 0.22 0.16
77%
16 Construction of Well 4 0.07 0.04
50%
17 Construction of Recharge Pits 2 0.01 0.00
55%
18 Constr of Gabion 2 0.03 0.03
83%
19 Construction of Toilets 1 0.00 0.00
100%
20 Deepening / Desilting of Flood Channels 1 0.00 0.00
89%
21 Construction of building/workshed for SHG 1 0.03 0.03
73%
22 Constr of Aganwadi 1 0.02 0.02
92%
Total 948 13.43 10.39
All 22 rows (zero-value rows hidden) ⇩ Export to Excel