MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
63,970
Sanctioned (pure scheme)
₹1,155.16 Cr
Expenditure since inception
₹844.35 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
2,576 works
₹238.65 Cr sanctioned
₹168.96 Cr spent (71%)
02
Constr of Cement Concrete Roads
10,303 works
₹134.60 Cr sanctioned
₹94.96 Cr spent (71%)
03
Construction of Check Dam/Stop Dam
1,352 works
₹99.11 Cr sanctioned
₹79.60 Cr spent (80%)
04
Works for Flood Control and Protection
1,657 works
₹81.58 Cr sanctioned
₹67.89 Cr spent (83%)
05
Plantation
1,841 works
₹68.89 Cr sanctioned
₹18.34 Cr spent (27%)
06
Construction of Bund
4,715 works
₹66.86 Cr sanctioned
₹46.89 Cr spent (70%)
07
Cattle Shed
5,474 works
₹60.10 Cr sanctioned
₹54.21 Cr spent (90%)
08
Construction of Tank
736 works
₹57.89 Cr sanctioned
₹45.80 Cr spent (79%)
09
Land Development
6,838 works
₹45.02 Cr sanctioned
₹26.76 Cr spent (59%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
500 works
₹41.02 Cr sanctioned
₹35.15 Cr spent (86%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 11,199 18.47 17.54
95%
2 Constr of Cement Concrete Roads 10,303 134.60 94.96
71%
3 Land Development 6,838 45.02 26.76
59%
4 Cattle Shed 5,474 60.10 54.21
90%
5 Construction of Bund 4,715 66.86 46.89
70%
6 Construction of Toilets 4,452 4.05 3.73
92%
7 Construction of NADEP/Vermi Compost Pit 2,839 6.19 3.30
53%
8 Construction of Road and Culvert 2,576 238.65 168.96
71%
9 Farm Pond 2,144 40.94 26.69
65%
10 Plantation 1,841 68.89 18.34
27%
11 Solid and Liquid Waste Management 1,828 2.93 2.36
80%
12 Works for Flood Control and Protection 1,657 81.58 67.89
83%
13 Construction of Check Dam/Stop Dam 1,352 99.11 79.60
80%
14 Construction of Tank 736 57.89 45.80
79%
15 Construction of Trench 644 32.90 26.31
80%
16 Construction of Crematorium 601 20.14 17.20
85%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 500 41.02 35.15
86%
18 Constr of Aganwadi 437 13.81 12.45
90%
19 Terracing 435 4.67 3.85
83%
20 Construction of Recharge Pits 400 2.53 2.20
87%
21 Repair & maint of Pond/ Tank 342 9.84 7.74
79%
22 Construction of Play field 312 10.38 6.68
64%
23 Renovation of traditional water bodies 298 4.66 3.38
73%
24 Constr of GP Bhawan 260 14.86 11.07
75%
25 Construction of Percolation Tank 233 17.89 14.23
80%
26 Community Sanitary Complex 202 0.89 0.80
91%
27 Construction of Canal 134 4.82 3.71
77%
28 Constr of Gabion 134 8.13 6.59
81%
29 Repair & maint of Road 126 4.16 3.87
93%
30 Construction of Embankment 122 7.03 5.76
82%
31 Goat Shelter 97 1.23 1.15
93%
32 Well Recharge 76 0.43 0.31
73%
33 Repair & Maint of Community infrastructure 66 3.14 2.34
75%
34 Construction of Well 65 0.68 0.72
106%
35 Culvert 52 1.42 1.38
97%
36 Boulder Check/Gully Plug 50 1.24 0.75
61%
37 Constr of Compound wall 47 1.88 1.53
82%
38 Lining of Canal 46 2.20 1.62
74%
39 Roof Water Harvesting on gov/panchayat bldg 41 1.10 0.88
80%
40 Constr of Food Grain storage 34 2.58 2.38
92%
41 Other Works 32 0.33 0.30
91%
42 Construction of Other Community Building/Assets 29 2.86 2.12
74%
43 Constr of Kitchen Shed 29 0.95 0.89
93%
44 Repair & Maint of Check Dam/Stop Dam 28 3.54 2.80
79%
45 Lift Irrigation 23 1.46 1.15
79%
46 Repair & Maint of Bund 20 0.59 0.49
84%
47 Repair & maint of Water Harvesting Structures 20 1.61 1.35
84%
48 Construction of Spur 15 1.19 1.05
88%
49 Nursery Development 13 0.36 0.11
30%
50 Deepening / Desilting of Flood Channels 13 0.72 0.67
93%
51 Strengthening of Embankment 12 1.28 1.27
100%
52 Poultry Shelter 4 0.19 0.15
80%
53 Construction of building/workshed for SHG 4 0.35 0.32
92%
54 Repair & maint of Percolation Tank 4 0.18 0.17
91%
55 Underground Dyke for Ground Water Recharge 3 0.16 0.15
95%
56 Construction of Village Haats 3 0.11 0.10
95%
57 Renovation of Canal 3 0.14 0.04
30%
58 Bio-Fertilizer 2 0.01 0.01
90%
59 Grass Land Development 2 0.21 0.10
47%
60 Repaire and Maint of NADEP/Vermi Compost Pit 1 0.00 0.00
101%
61 Piggery Shelter 1 0.02 0.02
100%
62 Construction of Fish Drying Infrastructure 1 0.00 0.00
16%
Total 63,970 1,155.16 844.35
All 62 rows (zero-value rows hidden) ⇩ Export to Excel