MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
2,10,497
Sanctioned (pure scheme)
₹2,545.74 Cr
Expenditure since inception
₹1,875.80 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
28,544 works
₹680.85 Cr sanctioned
₹519.98 Cr spent (76%)
02
Plantation
13,840 works
₹268.14 Cr sanctioned
₹76.72 Cr spent (29%)
03
Construction of Road and Culvert
5,303 works
₹252.16 Cr sanctioned
₹193.38 Cr spent (77%)
04
Construction of Well
12,537 works
₹241.25 Cr sanctioned
₹211.13 Cr spent (88%)
05
Rural Housing
84,040 works
₹151.43 Cr sanctioned
₹142.87 Cr spent (94%)
06
Land Development
13,727 works
₹139.02 Cr sanctioned
₹83.58 Cr spent (60%)
07
Farm Pond
7,860 works
₹125.86 Cr sanctioned
₹109.28 Cr spent (87%)
08
Constr of Cement Concrete Roads
10,446 works
₹124.77 Cr sanctioned
₹98.54 Cr spent (79%)
09
Construction of Bund
5,378 works
₹92.85 Cr sanctioned
₹71.45 Cr spent (77%)
10
Construction of Trench
2,256 works
₹70.68 Cr sanctioned
₹57.02 Cr spent (81%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 84,040 151.43 142.87
94%
2 Construction of Check Dam/Stop Dam 28,544 680.85 519.98
76%
3 Plantation 13,840 268.14 76.72
29%
4 Land Development 13,727 139.02 83.58
60%
5 Construction of Well 12,537 241.25 211.13
88%
6 Constr of Cement Concrete Roads 10,446 124.77 98.54
79%
7 Farm Pond 7,860 125.86 109.28
87%
8 Construction of Toilets 6,116 23.07 19.21
83%
9 Construction of Bund 5,378 92.85 71.45
77%
10 Construction of Road and Culvert 5,303 252.16 193.38
77%
11 Construction of NADEP/Vermi Compost Pit 2,836 16.26 12.52
77%
12 Construction of Trench 2,256 70.68 57.02
81%
13 Well Recharge 1,864 14.52 11.91
82%
14 Renovation of traditional water bodies 1,524 33.10 19.84
60%
15 Boulder Check/Gully Plug 1,493 19.35 14.92
77%
16 Repair & maint of Pond/ Tank 1,423 40.15 32.94
82%
17 Construction of Recharge Pits 1,392 4.90 3.75
77%
18 Construction of Tank 1,007 39.76 33.96
85%
19 Cattle Shed 969 11.48 10.39
91%
20 Construction of Crematorium 841 21.69 15.76
73%
21 Solid and Liquid Waste Management 816 5.77 4.58
79%
22 Construction of Percolation Tank 781 60.19 49.27
82%
23 Roof Water Harvesting on gov/panchayat bldg 772 2.47 1.91
77%
24 Constr of Aganwadi 558 12.50 9.95
80%
25 Construction of Play field 468 10.71 7.10
66%
26 Constr of GP Bhawan 345 11.95 9.84
82%
27 Constr of Compound wall 314 3.32 2.98
90%
28 Repair & Maint of Check Dam/Stop Dam 270 10.92 9.22
84%
29 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 242 6.97 3.27
47%
30 Culvert 208 4.72 4.16
88%
31 Terracing 202 3.64 2.72
75%
32 Repair & maint of Road 194 4.55 3.62
80%
33 Other Works 193 2.63 1.01
38%
34 Constr of Gabion 183 4.10 3.50
85%
35 Community Sanitary Complex 175 0.76 0.70
93%
36 Repair & maint of Water Harvesting Structures 149 2.24 1.77
79%
37 Constr of Food Grain storage 133 5.35 4.97
93%
38 Goat Shelter 127 1.06 0.90
85%
39 Constr of Kitchen Shed 122 0.37 0.30
82%
40 Poultry Shelter 98 0.95 0.87
92%
41 Underground Dyke for Ground Water Recharge 98 2.25 1.84
81%
42 Repair & Maint of Bund 88 1.79 1.52
85%
43 Nursery Development 74 1.83 0.67
37%
44 Repair & Maint of Community infrastructure 73 1.24 0.95
76%
45 Bio-Fertilizer 62 0.44 0.30
68%
46 Repair & maint of Percolation Tank 59 2.74 2.21
81%
47 Construction of building/workshed for SHG 51 1.59 1.35
85%
48 Repaire and Maint of NADEP/Vermi Compost Pit 50 0.31 0.26
82%
49 Works for Flood Control and Protection 44 1.26 0.63
50%
50 Construction of Spur 28 0.83 0.69
82%
51 Construction of Other Community Building/Assets 24 0.55 0.51
93%
52 Construction of Village Haats 13 0.33 0.27
81%
53 Construction of Embankment 13 1.79 1.55
87%
54 Grass Land Development 12 0.51 0.21
42%
55 Strengthening of Embankment 12 0.53 0.32
60%
56 Piggery Shelter 11 0.15 0.10
66%
57 Water Converation - Others 10 0.20 0.10
51%
58 Construction of Fish Drying Infrastructure 8 0.12 0.10
81%
59 Repair & Maint of Canal 5 0.21 0.13
61%
60 Deepening / Desilting of Flood Channels 4 0.04 0.08
202%
61 Renovation of Canal 3 0.13 0.07
56%
62 Fish Culture 2 0.26 0.01
3%
63 Construction of Canal 2 0.05 0.05
91%
64 Bio-gas plant 2 0.03 0.03
99%
65 Lift Irrigation 1 0.02 0.02
93%
66 Repair & maint of Gully Plugs 1 0.01 0.01
93%
67 Lining of Canal 1 0.04 0.03
82%
Total 2,10,497 2,545.74 1,875.80
All 67 rows (zero-value rows hidden) ⇩ Export to Excel