Showcase — Completed Works

Rollup last refreshed: 2026-09-28 07:03:45.697721
to
to
Reset filters
Scope
Works completed
542
Sanctioned (pure scheme)
₹6.91 Cr
Expenditure since inception
₹5.01 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
15 works
₹1.01 Cr sanctioned
₹62.21 L spent (62%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
6 works
₹66.53 L sanctioned
₹40.91 L spent (61%)
03
Construction of Bund
18 works
₹66.47 L sanctioned
₹52.41 L spent (79%)
04
Land Development
94 works
₹64.27 L sanctioned
₹53.70 L spent (84%)
05
Farm Pond
29 works
₹64.11 L sanctioned
₹53.54 L spent (84%)
06
Construction of Check Dam/Stop Dam
14 works
₹61.01 L sanctioned
₹43.33 L spent (71%)
07
Rural Housing
257 works
₹46.56 L sanctioned
₹45.44 L spent (98%)
08
Construction of Tank
10 works
₹46.01 L sanctioned
₹38.03 L spent (83%)
09
Constr of Cement Concrete Roads
28 works
₹43.00 L sanctioned
₹30.40 L spent (71%)
10
Renovation of Canal
2 works
₹24.07 L sanctioned
₹8.07 L spent (34%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 257 0.47 0.45
98%
2 Land Development 94 0.64 0.54
84%
3 Construction of Toilets 39 0.04 0.04
100%
4 Farm Pond 29 0.64 0.54
84%
5 Constr of Cement Concrete Roads 28 0.43 0.30
71%
6 Construction of Bund 18 0.66 0.52
79%
7 Construction of Road and Culvert 15 1.01 0.62
62%
8 Construction of Check Dam/Stop Dam 14 0.61 0.43
71%
9 Construction of Tank 10 0.46 0.38
83%
10 Cattle Shed 8 0.09 0.04
49%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 6 0.67 0.41
62%
12 Plantation 5 0.13 0.01
6%
13 Construction of Percolation Tank 2 0.04 0.03
73%
14 Renovation of Canal 2 0.24 0.08
34%
15 Well Recharge 2 0.00 0.00
63%
16 Construction of Recharge Pits 1 0.00 0.00
63%
17 Construction of building/workshed for SHG 1 0.06 0.05
90%
18 Strengthening of Embankment 1 0.00 0.00
92%
19 Terracing 1 0.15 0.11
77%
20 Construction of Crematorium 1 0.05 0.04
90%
21 Construction of Fish Drying Infrastructure 1 0.01 0.01
99%
22 Construction of Play field 1 0.09 0.00
1%
23 Renovation of traditional water bodies 1 0.02 0.02
92%
24 Construction of Trench 1 0.05 0.04
84%
25 Deepening / Desilting of Flood Channels 1 0.06 0.05
82%
26 Constr of Food Grain storage 1 0.13 0.13
98%
27 Lining of Canal 1 0.13 0.12
89%
28 Other Works 1 0.01 0.01
89%
Total 542 6.91 5.01
All 28 rows (zero-value rows hidden) ⇩ Export to Excel