MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-27 07:02:18.37299
to
to
Reset filters
Scope
Works completed
775
Sanctioned (pure scheme)
₹5.73 Cr
Expenditure since inception
₹4.85 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Land Development
91 works
₹86.39 L sanctioned
₹81.89 L spent (95%)
02
Construction of Road and Culvert
9 works
₹43.09 L sanctioned
₹37.83 L spent (88%)
03
Rural Housing
235 works
₹42.63 L sanctioned
₹42.76 L spent (100%)
04
Construction of Check Dam/Stop Dam
50 works
₹41.52 L sanctioned
₹31.02 L spent (75%)
05
Construction of Bund
30 works
₹39.69 L sanctioned
₹32.42 L spent (82%)
06
Works for Flood Control and Protection
12 works
₹38.33 L sanctioned
₹34.17 L spent (89%)
07
Repair & maint of Pond/ Tank
4 works
₹28.48 L sanctioned
₹24.96 L spent (88%)
08
Construction of Tank
6 works
₹26.66 L sanctioned
₹20.87 L spent (78%)
09
Farm Pond
20 works
₹26.48 L sanctioned
₹23.20 L spent (88%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
8 works
₹24.04 L sanctioned
₹19.19 L spent (80%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 235 42.63 42.76
100%
2 Construction of Toilets 212 21.99 21.50
98%
3 Land Development 91 86.39 81.89
95%
4 Construction of Check Dam/Stop Dam 50 41.52 31.02
75%
5 Construction of Bund 30 39.69 32.42
82%
6 Construction of NADEP/Vermi Compost Pit 28 22.09 16.53
75%
7 Farm Pond 20 26.48 23.20
88%
8 Constr of Cement Concrete Roads 18 10.81 8.31
77%
9 Works for Flood Control and Protection 12 38.33 34.17
89%
10 Construction of Road and Culvert 9 43.09 37.83
88%
11 Plantation 8 22.78 12.66
56%
12 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 8 24.04 19.19
80%
13 Solid and Liquid Waste Management 7 3.26 2.52
78%
14 Well Recharge 6 10.04 7.06
70%
15 Construction of Tank 6 26.66 20.87
78%
16 Cattle Shed 5 4.56 4.24
93%
17 Construction of Recharge Pits 4 1.01 0.66
66%
18 Repair & maint of Pond/ Tank 4 28.48 24.96
88%
19 Construction of Well 3 4.20 2.84
68%
20 Goat Shelter 2 0.93 0.85
92%
21 Underground Dyke for Ground Water Recharge 2 11.49 8.76
76%
22 Construction of Percolation Tank 2 9.14 6.67
73%
23 Construction of Canal 2 13.51 9.02
67%
24 Repaire and Maint of NADEP/Vermi Compost Pit 2 4.13 3.43
83%
25 Deepening / Desilting of Flood Channels 1 6.50 4.97
76%
26 Constr of Aganwadi 1 0.44 0.43
99%
27 Constr of Compound wall 1 0.42 0.41
100%
28 Constr of Gabion 1 6.98 6.73
96%
29 Bio-Fertilizer 1 0.54 0.50
92%
30 Renovation of traditional water bodies 1 1.00 0.97
97%
31 Repair & maint of Water Harvesting Structures 1 8.19 6.76
83%
32 Roof Water Harvesting on gov/panchayat bldg 1 0.05 0.05
91%
33 Terracing 1 11.69 10.39
89%
Total 775 573.07 484.57
All 33 rows (zero-value rows hidden) ⇩ Export to Excel