MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-17 07:02:43.056659
to
to
Reset filters
Scope
Works completed
761
Sanctioned (pure scheme)
₹5.72 Cr
Expenditure since inception
₹5.65 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
14 works
₹59.69 L sanctioned
₹51.62 L spent (86%)
02
Construction of Road and Culvert
30 works
₹58.87 L sanctioned
₹1.02 Cr spent (174%)
03
Construction of Fish Drying Infrastructure
13 works
₹56.35 L sanctioned
₹45.91 L spent (81%)
04
Rural Housing
292 works
₹53.71 L sanctioned
₹53.27 L spent (99%)
05
Construction of Bund
106 works
₹50.12 L sanctioned
₹40.25 L spent (80%)
06
Construction of Tank
11 works
₹45.80 L sanctioned
₹38.78 L spent (85%)
07
Repair & maint of Pond/ Tank
4 works
₹37.88 L sanctioned
₹23.30 L spent (61%)
08
Construction of Check Dam/Stop Dam
25 works
₹34.74 L sanctioned
₹51.18 L spent (147%)
09
Deepening / Desilting of Flood Channels
3 works
₹32.98 L sanctioned
₹28.41 L spent (86%)
10
Farm Pond
38 works
₹29.53 L sanctioned
₹26.05 L spent (88%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 292 0.54 0.53
99%
2 Construction of Bund 106 0.50 0.40
80%
3 Land Development 76 0.19 0.21
110%
4 Construction of Trench 71 0.15 0.26
170%
5 Farm Pond 38 0.30 0.26
88%
6 Construction of Road and Culvert 30 0.59 1.02
174%
7 Construction of Check Dam/Stop Dam 25 0.35 0.51
147%
8 Construction of NADEP/Vermi Compost Pit 21 0.03 0.02
63%
9 Constr of Cement Concrete Roads 21 0.15 0.09
62%
10 Construction of Toilets 14 0.05 0.05
90%
11 Works for Flood Control and Protection 14 0.60 0.52
87%
12 Construction of Fish Drying Infrastructure 13 0.56 0.46
82%
13 Construction of Tank 11 0.46 0.39
85%
14 Repair & Maint of Fish Drying Infrastructure 7 0.24 0.23
95%
15 Repair & maint of Pond/ Tank 4 0.38 0.23
62%
16 Plantation 4 0.09 0.03
34%
17 Solid and Liquid Waste Management 4 0.00 0.00
44%
18 Deepening / Desilting of Flood Channels 3 0.33 0.28
86%
19 Construction of Recharge Pits 2 0.03 0.03
81%
20 Fish Culture 1 0.05 0.04
81%
21 Renovation of traditional water bodies 1 0.07 0.05
78%
22 Repair & Maint of Canal 1 0.02 0.01
88%
23 Construction of Play field 1 0.05 0.02
35%
24 Community Sanitary Complex 1 0.00 0.00
100%
Total 761 5.72 5.65
All 24 rows (zero-value rows hidden) ⇩ Export to Excel