Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
27 works
₹3.79 Cr sanctioned
₹3.77 Cr spent (99%)
02
Construction of Check Dam/Stop Dam
21 works
₹3.10 Cr sanctioned
₹3.04 Cr spent (98%)
03
Construction of Percolation Tank
5 works
₹1.29 Cr sanctioned
₹1.27 Cr spent (98%)
04
Construction of Trench
8 works
₹1.19 Cr sanctioned
₹1.17 Cr spent (98%)
05
Construction of Road and Culvert
12 works
₹86.58 L sanctioned
₹53.62 L spent (62%)
06
Constr of GP Bhawan
2 works
₹42.61 L sanctioned
₹37.43 L spent (88%)
07
Farm Pond
20 works
₹31.91 L sanctioned
₹29.34 L spent (92%)
08
Works for Flood Control and Protection
5 works
₹31.64 L sanctioned
₹21.27 L spent (67%)
09
Constr of Cement Concrete Roads
28 works
₹18.96 L sanctioned
₹15.52 L spent (82%)
10
Cattle Shed
26 works
₹18.74 L sanctioned
₹17.64 L spent (94%)