Showcase — Completed Works
Rollup last refreshed: 2026-10-18 07:05:29.52731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
13 works
₹1.60 Cr sanctioned
₹1.50 Cr spent (93%)
02
Construction of Road and Culvert
14 works
₹79.12 L sanctioned
₹56.59 L spent (72%)
03
Construction of Bund
5 works
₹63.24 L sanctioned
₹60.93 L spent (96%)
04
Works for Flood Control and Protection
4 works
₹46.49 L sanctioned
₹41.20 L spent (89%)
05
Boulder Check/Gully Plug
2 works
₹23.78 L sanctioned
₹21.86 L spent (92%)
06
Construction of Percolation Tank
1 works
₹14.74 L sanctioned
₹12.93 L spent (88%)
07
Plantation
3 works
₹10.19 L sanctioned
₹8.09 L spent (79%)
08
Farm Pond
37 works
₹10.01 L sanctioned
₹9.98 L spent (100%)
09
Constr of Cement Concrete Roads
13 works
₹9.11 L sanctioned
₹8.88 L spent (97%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹9.04 L sanctioned
₹7.15 L spent (79%)