MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
13,287
Sanctioned (pure scheme)
₹438.00 Cr
Expenditure since inception
₹368.13 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
1,076 works
₹141.73 Cr sanctioned
₹134.42 Cr spent (95%)
02
Construction of Road and Culvert
1,335 works
₹78.62 Cr sanctioned
₹57.09 Cr spent (73%)
03
Construction of Bund
332 works
₹43.54 Cr sanctioned
₹41.07 Cr spent (94%)
04
Works for Flood Control and Protection
394 works
₹39.88 Cr sanctioned
₹33.44 Cr spent (84%)
05
Plantation
781 works
₹22.41 Cr sanctioned
₹8.51 Cr spent (38%)
06
Constr of Cement Concrete Roads
1,999 works
₹19.84 Cr sanctioned
₹13.73 Cr spent (69%)
07
Construction of Percolation Tank
147 works
₹18.89 Cr sanctioned
₹16.63 Cr spent (88%)
08
Cattle Shed
1,299 works
₹16.78 Cr sanctioned
₹14.65 Cr spent (87%)
09
Boulder Check/Gully Plug
89 works
₹8.54 Cr sanctioned
₹7.27 Cr spent (85%)
10
Land Development
583 works
₹5.82 Cr sanctioned
₹5.81 Cr spent (100%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Constr of Cement Concrete Roads 1,999 19.84 13.73
69%
2 Rural Housing 1,907 3.05 2.79
92%
3 Construction of Road and Culvert 1,335 78.62 57.09
73%
4 Cattle Shed 1,299 16.78 14.65
87%
5 Construction of Toilets 1,251 0.61 0.53
87%
6 Construction of Check Dam/Stop Dam 1,076 141.73 134.42
95%
7 Plantation 781 22.41 8.51
38%
8 Farm Pond 684 2.73 2.72
99%
9 Land Development 583 5.82 5.81
100%
10 Works for Flood Control and Protection 394 39.88 33.44
84%
11 Construction of NADEP/Vermi Compost Pit 354 1.31 1.16
89%
12 Construction of Bund 332 43.54 41.07
94%
13 Construction of Recharge Pits 199 0.54 0.45
83%
14 Construction of Percolation Tank 147 18.89 16.63
88%
15 Construction of Crematorium 123 3.34 2.73
82%
16 Construction of Trench 99 2.51 2.04
82%
17 Boulder Check/Gully Plug 89 8.54 7.27
85%
18 Repair & maint of Pond/ Tank 89 2.67 2.24
84%
19 Construction of Tank 85 5.60 5.06
91%
20 Community Sanitary Complex 81 0.39 0.37
94%
21 Renovation of traditional water bodies 77 1.35 1.11
82%
22 Construction of Play field 62 2.06 1.50
73%
23 Constr of Aganwadi 40 0.95 0.86
91%
24 Well Recharge 37 0.71 0.56
79%
25 Constr of GP Bhawan 36 3.86 2.41
63%
26 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 19 2.67 2.48
93%
27 Roof Water Harvesting on gov/panchayat bldg 14 0.64 0.55
87%
28 Deepening / Desilting of Flood Channels 13 0.12 0.14
118%
29 Construction of Canal 11 1.90 1.43
75%
30 Construction of Embankment 9 1.23 1.07
87%
31 Constr of Gabion 8 1.19 1.10
93%
32 Solid and Liquid Waste Management 6 0.02 0.02
89%
33 Grass Land Development 6 0.46 0.24
53%
34 Construction of Spur 5 0.65 0.62
95%
35 Bio-Fertilizer 4 0.03 0.03
78%
36 Constr of Compound wall 4 0.10 0.08
79%
37 Repair & maint of Road 4 0.02 0.02
99%
38 Underground Dyke for Ground Water Recharge 4 0.25 0.23
92%
39 Culvert 3 0.02 0.04
147%
40 Constr of Food Grain storage 3 0.29 0.28
96%
41 Terracing 2 0.13 0.13
97%
42 Repair & Maint of Community infrastructure 2 0.05 0.05
96%
43 Repair & maint of Percolation Tank 2 0.27 0.25
92%
44 Repair & Maint of Bund 2 0.15 0.13
91%
45 Strengthening of Embankment 2 0.05 0.05
107%
46 Repair & maint of Water Harvesting Structures 2 0.00 0.00
89%
47 Repaire and Maint of NADEP/Vermi Compost Pit 1 0.00 0.00
72%
48 Construction of Well 1 0.03 0.01
48%
49 Lining of Canal 1 0.00 0.03
0%
Total 13,287 438.00 368.13
All 49 rows (zero-value rows hidden) ⇩ Export to Excel