Showcase — Completed Works
Rollup last refreshed: 2026-08-23 08:31:42.168333
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
23 works
₹2.83 Cr sanctioned
₹2.57 Cr spent (91%)
02
Construction of Road and Culvert
18 works
₹2.60 Cr sanctioned
₹1.28 Cr spent (49%)
03
Construction of Check Dam/Stop Dam
21 works
₹2.52 Cr sanctioned
₹2.36 Cr spent (93%)
04
Construction of Bund
6 works
₹91.12 L sanctioned
₹86.35 L spent (95%)
05
Construction of Trench
3 works
₹44.11 L sanctioned
₹43.22 L spent (98%)
06
Works for Flood Control and Protection
4 works
₹39.42 L sanctioned
₹36.33 L spent (92%)
07
Constr of Cement Concrete Roads
13 works
₹25.32 L sanctioned
₹11.94 L spent (47%)
08
Constr of Gabion
1 works
₹24.95 L sanctioned
₹24.48 L spent (98%)
09
Farm Pond
31 works
₹21.93 L sanctioned
₹21.01 L spent (96%)
10
Construction of Tank
2 works
₹19.94 L sanctioned
₹18.19 L spent (91%)