Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
50 works
₹5.31 Cr sanctioned
₹5.24 Cr spent (99%)
02
Construction of Bund
21 works
₹3.51 Cr sanctioned
₹3.31 Cr spent (94%)
03
Boulder Check/Gully Plug
11 works
₹1.52 Cr sanctioned
₹1.14 Cr spent (75%)
04
Construction of Road and Culvert
21 works
₹1.49 Cr sanctioned
₹1.13 Cr spent (76%)
05
Works for Flood Control and Protection
6 works
₹80.75 L sanctioned
₹56.85 L spent (70%)
06
Construction of Tank
10 works
₹63.47 L sanctioned
₹60.04 L spent (95%)
07
Plantation
7 works
₹31.82 L sanctioned
₹17.87 L spent (56%)
08
Construction of Percolation Tank
3 works
₹30.20 L sanctioned
₹28.44 L spent (94%)
09
Terracing
2 works
₹26.92 L sanctioned
₹26.17 L spent (97%)
10
Cattle Shed
30 works
₹25.32 L sanctioned
₹23.10 L spent (91%)