Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:49:07.017331
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
44 works
₹5.09 Cr sanctioned
₹4.66 Cr spent (91%)
02
Works for Flood Control and Protection
22 works
₹2.96 Cr sanctioned
₹2.65 Cr spent (90%)
03
Construction of Road and Culvert
17 works
₹76.50 L sanctioned
₹66.90 L spent (87%)
04
Construction of Tank
3 works
₹34.16 L sanctioned
₹32.44 L spent (95%)
05
Rural Housing
211 works
₹33.28 L sanctioned
₹32.24 L spent (97%)
06
Cattle Shed
38 works
₹32.56 L sanctioned
₹29.68 L spent (91%)
07
Construction of Percolation Tank
2 works
₹29.74 L sanctioned
₹28.00 L spent (94%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹29.57 L sanctioned
₹28.23 L spent (95%)
09
Repair & Maint of Bund
1 works
₹14.97 L sanctioned
₹14.28 L spent (95%)
10
Construction of Check Dam/Stop Dam
2 works
₹14.85 L sanctioned
₹14.22 L spent (96%)