Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
29 works
₹4.20 Cr sanctioned
₹4.05 Cr spent (96%)
02
Construction of Check Dam/Stop Dam
25 works
₹3.00 Cr sanctioned
₹2.76 Cr spent (92%)
03
Construction of Road and Culvert
13 works
₹1.97 Cr sanctioned
₹1.69 Cr spent (86%)
04
Construction of Tank
10 works
₹1.53 Cr sanctioned
₹1.31 Cr spent (85%)
05
Boulder Check/Gully Plug
11 works
₹1.47 Cr sanctioned
₹1.37 Cr spent (93%)
06
Construction of Bund
11 works
₹1.38 Cr sanctioned
₹1.20 Cr spent (87%)
07
Works for Flood Control and Protection
7 works
₹94.16 L sanctioned
₹42.49 L spent (45%)
08
Construction of Spur
3 works
₹72.99 L sanctioned
₹59.81 L spent (82%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹53.97 L sanctioned
₹51.61 L spent (96%)
10
Construction of Trench
5 works
₹49.77 L sanctioned
₹48.31 L spent (97%)