Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
15 works
₹1.28 Cr sanctioned
₹1.18 Cr spent (92%)
02
Construction of Road and Culvert
13 works
₹1.18 Cr sanctioned
₹79.31 L spent (67%)
03
Construction of Bund
4 works
₹59.75 L sanctioned
₹48.76 L spent (82%)
04
Repair & maint of Water Harvesting Structures
4 works
₹47.82 L sanctioned
₹45.45 L spent (95%)
05
Plantation
6 works
₹44.55 L sanctioned
₹39.80 L spent (89%)
06
Repair & maint of Road
2 works
₹29.92 L sanctioned
₹28.84 L spent (96%)
07
Construction of Embankment
2 works
₹29.80 L sanctioned
₹29.35 L spent (99%)
08
Works for Flood Control and Protection
3 works
₹28.87 L sanctioned
₹23.24 L spent (80%)
09
Repair & Maint of Check Dam/Stop Dam
2 works
₹19.64 L sanctioned
₹17.96 L spent (91%)
10
Construction of Trench
3 works
₹15.63 L sanctioned
₹14.90 L spent (95%)