Showcase — Completed Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
41 works
₹5.14 Cr sanctioned
₹4.91 Cr spent (96%)
02
Plantation
27 works
₹2.36 Cr sanctioned
₹1.97 Cr spent (83%)
03
Construction of Road and Culvert
20 works
₹1.98 Cr sanctioned
₹65.13 L spent (33%)
04
Works for Flood Control and Protection
15 works
₹1.93 Cr sanctioned
₹1.58 Cr spent (82%)
05
Construction of Tank
5 works
₹69.85 L sanctioned
₹64.82 L spent (93%)
06
Constr of Gabion
4 works
₹59.49 L sanctioned
₹56.23 L spent (95%)
07
Repair & maint of Pond/ Tank
4 works
₹59.17 L sanctioned
₹52.77 L spent (89%)
08
Boulder Check/Gully Plug
9 works
₹44.92 L sanctioned
₹37.37 L spent (83%)
09
Construction of Bund
3 works
₹40.84 L sanctioned
₹39.91 L spent (98%)
10
Repair & Maint of Check Dam/Stop Dam
2 works
₹39.48 L sanctioned
₹36.64 L spent (93%)