Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
18 works
₹2.28 Cr sanctioned
₹2.04 Cr spent (90%)
02
Construction of Road and Culvert
26 works
₹1.90 Cr sanctioned
₹1.31 Cr spent (69%)
03
Construction of Check Dam/Stop Dam
13 works
₹1.20 Cr sanctioned
₹1.04 Cr spent (87%)
04
Plantation
7 works
₹60.85 L sanctioned
₹43.64 L spent (72%)
05
Construction of Trench
4 works
₹59.40 L sanctioned
₹53.37 L spent (90%)
06
Constr of Cement Concrete Roads
11 works
₹38.47 L sanctioned
₹35.53 L spent (92%)
07
Solid and Liquid Waste Management
3 works
₹27.45 L sanctioned
₹18.07 L spent (66%)
08
Terracing
2 works
₹24.51 L sanctioned
₹23.50 L spent (96%)
09
Cattle Shed
23 works
₹20.05 L sanctioned
₹15.62 L spent (78%)
10
Farm Pond
14 works
₹18.04 L sanctioned
₹14.27 L spent (79%)