Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
12 works
₹1.54 Cr sanctioned
₹1.46 Cr spent (95%)
02
Plantation
12 works
₹1.10 Cr sanctioned
₹76.86 L spent (70%)
03
Works for Flood Control and Protection
8 works
₹1.08 Cr sanctioned
₹85.56 L spent (79%)
04
Construction of Road and Culvert
14 works
₹1.02 Cr sanctioned
₹74.52 L spent (73%)
05
Construction of Trench
5 works
₹74.08 L sanctioned
₹59.46 L spent (80%)
06
Cattle Shed
54 works
₹43.20 L sanctioned
₹24.74 L spent (57%)
07
Constr of Gabion
3 works
₹35.22 L sanctioned
₹32.86 L spent (93%)
08
Repair & maint of Water Harvesting Structures
2 works
₹34.09 L sanctioned
₹29.78 L spent (87%)
09
Construction of Recharge Pits
3 works
₹30.10 L sanctioned
₹29.08 L spent (97%)
10
Construction of Percolation Tank
3 works
₹29.93 L sanctioned
₹28.90 L spent (97%)