Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
22 works
₹2.89 Cr sanctioned
₹2.80 Cr spent (97%)
02
Construction of Trench
21 works
₹2.60 Cr sanctioned
₹2.44 Cr spent (94%)
03
Repair & Maint of Check Dam/Stop Dam
23 works
₹2.29 Cr sanctioned
₹2.18 Cr spent (95%)
04
Repair & maint of Percolation Tank
15 works
₹1.94 Cr sanctioned
₹1.87 Cr spent (97%)
05
Construction of Check Dam/Stop Dam
14 works
₹1.52 Cr sanctioned
₹1.46 Cr spent (96%)
06
Construction of Road and Culvert
20 works
₹1.26 Cr sanctioned
₹1.03 Cr spent (82%)
07
Works for Flood Control and Protection
6 works
₹84.08 L sanctioned
₹64.77 L spent (77%)
08
Construction of Bund
6 works
₹81.13 L sanctioned
₹78.27 L spent (96%)
09
Plantation
12 works
₹67.22 L sanctioned
₹53.09 L spent (79%)
10
Repair & maint of Road
1 works
₹48.93 L sanctioned
₹48.37 L spent (99%)