Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Cattle Shed
221 works
₹3.12 Cr sanctioned
₹1.93 Cr spent (62%)
02
Construction of Road and Culvert
37 works
₹2.07 Cr sanctioned
₹1.69 Cr spent (82%)
03
Construction of Check Dam/Stop Dam
27 works
₹1.88 Cr sanctioned
₹1.77 Cr spent (94%)
04
Repair & Maint of Check Dam/Stop Dam
15 works
₹1.42 Cr sanctioned
₹1.28 Cr spent (90%)
05
Works for Flood Control and Protection
13 works
₹1.16 Cr sanctioned
₹66.64 L spent (57%)
06
Construction of Tank
7 works
₹74.27 L sanctioned
₹71.08 L spent (96%)
07
Construction of Bund
8 works
₹52.42 L sanctioned
₹50.06 L spent (95%)
08
Repair & maint of Water Harvesting Structures
4 works
₹43.35 L sanctioned
₹41.88 L spent (97%)
09
Boulder Check/Gully Plug
5 works
₹31.49 L sanctioned
₹25.16 L spent (80%)
10
Land Development
65 works
₹21.00 L sanctioned
₹39.88 L spent (190%)