Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
38 works
₹5.22 Cr sanctioned
₹4.55 Cr spent (87%)
02
Construction of Road and Culvert
16 works
₹1.67 Cr sanctioned
₹1.37 Cr spent (82%)
03
Construction of Percolation Tank
4 works
₹48.68 L sanctioned
₹42.59 L spent (87%)
04
Construction of Canal
3 works
₹39.54 L sanctioned
₹32.56 L spent (82%)
05
Construction of Bund
2 works
₹16.69 L sanctioned
₹10.48 L spent (63%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.96 L sanctioned
₹14.64 L spent (98%)
07
Construction of Check Dam/Stop Dam
2 works
₹10.65 L sanctioned
₹10.44 L spent (98%)
08
Rural Housing
57 works
₹8.77 L sanctioned
₹8.94 L spent (102%)
09
Strengthening of Embankment
1 works
₹8.02 L sanctioned
₹6.47 L spent (81%)
10
Construction of Crematorium
2 works
₹7.13 L sanctioned
₹5.24 L spent (74%)