Showcase — Completed Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
15 works
₹2.20 Cr sanctioned
₹1.81 Cr spent (82%)
02
Construction of Tank
18 works
₹1.88 Cr sanctioned
₹1.61 Cr spent (86%)
03
Construction of Percolation Tank
14 works
₹1.36 Cr sanctioned
₹1.22 Cr spent (90%)
04
Works for Flood Control and Protection
9 works
₹1.27 Cr sanctioned
₹1.22 Cr spent (96%)
05
Construction of Bund
8 works
₹1.04 Cr sanctioned
₹92.42 L spent (89%)
06
Terracing
4 works
₹97.09 L sanctioned
₹71.37 L spent (74%)
07
Construction of Road and Culvert
9 works
₹80.33 L sanctioned
₹66.49 L spent (83%)
08
Repair & maint of Pond/ Tank
6 works
₹65.06 L sanctioned
₹50.69 L spent (78%)
09
Repair & Maint of Check Dam/Stop Dam
3 works
₹42.47 L sanctioned
₹42.31 L spent (100%)
10
Construction of Spur
1 works
₹24.54 L sanctioned
₹20.78 L spent (85%)