Showcase — Completed Works
Rollup last refreshed: 2026-10-15 06:57:05.982177
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
25 works
₹2.30 Cr sanctioned
₹1.74 Cr spent (76%)
02
Construction of Road and Culvert
18 works
₹1.72 Cr sanctioned
₹1.25 Cr spent (72%)
03
Works for Flood Control and Protection
8 works
₹1.18 Cr sanctioned
₹96.06 L spent (82%)
04
Construction of Bund
2 works
₹38.59 L sanctioned
₹29.91 L spent (78%)
05
Cattle Shed
1 works
₹27.72 L sanctioned
₹23.72 L spent (86%)
06
Repair & Maint of Check Dam/Stop Dam
1 works
₹24.98 L sanctioned
₹13.13 L spent (53%)
07
Farm Pond
12 works
₹9.02 L sanctioned
₹6.59 L spent (73%)
08
Renovation of traditional water bodies
2 works
₹7.61 L sanctioned
₹5.82 L spent (76%)
09
Construction of Check Dam/Stop Dam
6 works
₹5.07 L sanctioned
₹4.75 L spent (94%)
10
Constr of Cement Concrete Roads
5 works
₹5.00 L sanctioned
₹4.44 L spent (89%)