Showcase — Completed Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Works completed
86
Sanctioned (pure scheme)
₹5.02 Cr
Expenditure since inception
₹4.28 Cr
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
15 works
₹2.05 Cr sanctioned
₹1.86 Cr spent (91%)
02
Construction of Check Dam/Stop Dam
10 works
₹1.09 Cr sanctioned
₹1.06 Cr spent (97%)
03
Construction of Road and Culvert
13 works
₹77.12 L sanctioned
₹62.45 L spent (81%)
04
Construction of Percolation Tank
2 works
₹27.07 L sanctioned
₹22.66 L spent (84%)
05
Terracing
4 works
₹19.10 L sanctioned
₹6.39 L spent (33%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.96 L sanctioned
₹14.31 L spent (96%)
07
Construction of Tank
1 works
₹10.00 L sanctioned
₹9.61 L spent (96%)
08
Farm Pond
5 works
₹9.99 L sanctioned
₹6.10 L spent (61%)
09
Construction of Crematorium
2 works
₹7.53 L sanctioned
₹3.19 L spent (42%)
10
Plantation
4 works
₹6.74 L sanctioned
₹44,409 spent (7%)