Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
1,253 works
₹157.96 Cr sanctioned
₹140.72 Cr spent (89%)
02
Construction of Road and Culvert
828 works
₹74.30 Cr sanctioned
₹62.86 Cr spent (85%)
03
Construction of Check Dam/Stop Dam
493 works
₹34.14 Cr sanctioned
₹31.10 Cr spent (91%)
04
Construction of Tank
239 works
₹24.74 Cr sanctioned
₹21.85 Cr spent (88%)
05
Plantation
571 works
₹21.16 Cr sanctioned
₹12.76 Cr spent (60%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
135 works
₹11.80 Cr sanctioned
₹10.62 Cr spent (90%)
07
Construction of Bund
104 works
₹11.18 Cr sanctioned
₹9.93 Cr spent (89%)
08
Construction of Percolation Tank
92 works
₹9.57 Cr sanctioned
₹8.75 Cr spent (92%)
09
Repair & maint of Pond/ Tank
123 works
₹8.79 Cr sanctioned
₹7.81 Cr spent (89%)
10
Constr of Cement Concrete Roads
813 works
₹8.02 Cr sanctioned
₹6.92 Cr spent (86%)