Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
24 works
₹2.61 Cr sanctioned
₹2.53 Cr spent (97%)
02
Works for Flood Control and Protection
16 works
₹1.85 Cr sanctioned
₹1.74 Cr spent (94%)
03
Construction of Road and Culvert
21 works
₹1.10 Cr sanctioned
₹1.06 Cr spent (96%)
04
Construction of Bund
5 works
₹51.14 L sanctioned
₹48.38 L spent (95%)
05
Land Development
6 works
₹44.53 L sanctioned
₹21.52 L spent (48%)
06
Deepening / Desilting of Flood Channels
4 works
₹19.10 L sanctioned
₹26.07 L spent (137%)
07
Constr of GP Bhawan
2 works
₹17.84 L sanctioned
₹12.67 L spent (71%)
08
Plantation
13 works
₹15.35 L sanctioned
₹7.85 L spent (51%)
09
Constr of Gabion
1 works
₹14.85 L sanctioned
₹13.41 L spent (90%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹12.78 L sanctioned
₹12.69 L spent (99%)