Showcase — Completed Works
Rollup last refreshed: 2026-10-13 07:05:51.512495
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
14 works
₹1.59 Cr sanctioned
₹1.34 Cr spent (84%)
02
Construction of Check Dam/Stop Dam
14 works
₹1.54 Cr sanctioned
₹1.29 Cr spent (84%)
03
Construction of Road and Culvert
22 works
₹1.20 Cr sanctioned
₹1.18 Cr spent (98%)
04
Cattle Shed
94 works
₹74.72 L sanctioned
₹71.67 L spent (96%)
05
Construction of Bund
4 works
₹46.55 L sanctioned
₹44.63 L spent (96%)
06
Farm Pond
98 works
₹27.16 L sanctioned
₹44.96 L spent (166%)
07
Deepening / Desilting of Flood Channels
9 works
₹25.55 L sanctioned
₹24.25 L spent (95%)
08
Land Development
45 works
₹23.36 L sanctioned
₹20.74 L spent (89%)
09
Construction of Well
29 works
₹20.80 L sanctioned
₹26.15 L spent (126%)
10
Construction of Tank
2 works
₹15.50 L sanctioned
₹13.59 L spent (88%)