Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
31 works
₹2.41 Cr sanctioned
₹1.97 Cr spent (82%)
02
Construction of Check Dam/Stop Dam
14 works
₹2.14 Cr sanctioned
₹2.00 Cr spent (93%)
03
Works for Flood Control and Protection
12 works
₹1.73 Cr sanctioned
₹1.42 Cr spent (82%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹1.04 Cr sanctioned
₹1.02 Cr spent (98%)
05
Construction of Bund
7 works
₹1.02 Cr sanctioned
₹96.72 L spent (95%)
06
Cattle Shed
70 works
₹56.00 L sanctioned
₹51.75 L spent (92%)
07
Construction of Spur
4 works
₹38.93 L sanctioned
₹37.72 L spent (97%)
08
Farm Pond
81 works
₹35.97 L sanctioned
₹45.41 L spent (126%)
09
Construction of Well
26 works
₹34.80 L sanctioned
₹32.76 L spent (94%)
10
Plantation
9 works
₹34.13 L sanctioned
₹30.19 L spent (88%)