Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
35 works
₹5.73 Cr sanctioned
₹5.44 Cr spent (95%)
02
Construction of Bund
24 works
₹3.84 Cr sanctioned
₹3.82 Cr spent (100%)
03
Construction of Tank
15 works
₹2.68 Cr sanctioned
₹2.64 Cr spent (98%)
04
Construction of Recharge Pits
21 works
₹2.46 Cr sanctioned
₹2.44 Cr spent (99%)
05
Construction of Road and Culvert
20 works
₹1.90 Cr sanctioned
₹1.53 Cr spent (81%)
06
Construction of Trench
6 works
₹1.23 Cr sanctioned
₹1.22 Cr spent (99%)
07
Rural Housing
351 works
₹62.19 L sanctioned
₹61.00 L spent (98%)
08
Farm Pond
52 works
₹58.20 L sanctioned
₹48.93 L spent (84%)
09
Works for Flood Control and Protection
4 works
₹42.85 L sanctioned
₹36.20 L spent (84%)
10
Cattle Shed
42 works
₹35.20 L sanctioned
₹28.43 L spent (81%)