Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
28 works
₹3.30 Cr sanctioned
₹2.60 Cr spent (79%)
02
Plantation
21 works
₹2.31 Cr sanctioned
₹2.28 Cr spent (98%)
03
Construction of Check Dam/Stop Dam
22 works
₹2.27 Cr sanctioned
₹2.36 Cr spent (104%)
04
Construction of Road and Culvert
36 works
₹1.55 Cr sanctioned
₹1.52 Cr spent (98%)
05
Construction of Trench
10 works
₹1.46 Cr sanctioned
₹1.44 Cr spent (98%)
06
Construction of Bund
7 works
₹96.89 L sanctioned
₹93.23 L spent (96%)
07
Repair & Maint of Check Dam/Stop Dam
2 works
₹29.45 L sanctioned
₹29.35 L spent (100%)
08
Repair & maint of Water Harvesting Structures
2 works
₹28.90 L sanctioned
₹28.79 L spent (100%)
09
Constr of Cement Concrete Roads
28 works
₹15.60 L sanctioned
₹17.23 L spent (110%)
10
Repair & Maint of Bund
1 works
₹14.83 L sanctioned
₹14.81 L spent (100%)