Showcase — Completed Works
Rollup last refreshed: 2026-10-13 07:05:51.512495
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
23 works
₹3.12 Cr sanctioned
₹2.92 Cr spent (93%)
02
Boulder Check/Gully Plug
19 works
₹2.37 Cr sanctioned
₹2.31 Cr spent (97%)
03
Construction of Check Dam/Stop Dam
20 works
₹1.64 Cr sanctioned
₹1.71 Cr spent (104%)
04
Construction of Road and Culvert
29 works
₹1.61 Cr sanctioned
₹1.53 Cr spent (95%)
05
Construction of Trench
7 works
₹91.53 L sanctioned
₹86.50 L spent (95%)
06
Works for Flood Control and Protection
7 works
₹90.00 L sanctioned
₹80.59 L spent (90%)
07
Plantation
14 works
₹59.23 L sanctioned
₹54.46 L spent (92%)
08
Farm Pond
39 works
₹40.55 L sanctioned
₹43.90 L spent (108%)
09
Constr of Food Grain storage
1 works
₹27.72 L sanctioned
₹27.27 L spent (98%)
10
Constr of Cement Concrete Roads
15 works
₹20.75 L sanctioned
₹23.18 L spent (112%)