Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Roof Water Harvesting on gov/panchayat bldg
30 works
₹3.70 Cr sanctioned
₹3.32 Cr spent (90%)
02
Works for Flood Control and Protection
11 works
₹1.52 Cr sanctioned
₹1.31 Cr spent (86%)
03
Construction of Check Dam/Stop Dam
14 works
₹1.20 Cr sanctioned
₹1.19 Cr spent (99%)
04
Construction of Bund
9 works
₹1.02 Cr sanctioned
₹96.01 L spent (94%)
05
Construction of Road and Culvert
25 works
₹71.37 L sanctioned
₹75.32 L spent (106%)
06
Construction of Tank
4 works
₹50.44 L sanctioned
₹43.28 L spent (86%)
07
Land Development
16 works
₹33.09 L sanctioned
₹8.49 L spent (26%)
08
Farm Pond
49 works
₹14.99 L sanctioned
₹24.97 L spent (167%)
09
Construction of Trench
1 works
₹14.09 L sanctioned
₹11.12 L spent (79%)
10
Deepening / Desilting of Flood Channels
5 works
₹13.97 L sanctioned
₹12.32 L spent (88%)