Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
38 works
₹5.11 Cr sanctioned
₹5.01 Cr spent (98%)
02
Construction of Check Dam/Stop Dam
41 works
₹4.48 Cr sanctioned
₹4.32 Cr spent (97%)
03
Construction of Road and Culvert
28 works
₹1.71 Cr sanctioned
₹1.37 Cr spent (80%)
04
Construction of Spur
11 works
₹1.37 Cr sanctioned
₹1.36 Cr spent (99%)
05
Construction of Trench
7 works
₹87.79 L sanctioned
₹86.99 L spent (99%)
06
Boulder Check/Gully Plug
5 works
₹73.23 L sanctioned
₹72.38 L spent (99%)
07
Construction of Tank
5 works
₹65.94 L sanctioned
₹65.44 L spent (99%)
08
Constr of Cement Concrete Roads
27 works
₹54.51 L sanctioned
₹50.02 L spent (92%)
09
Works for Flood Control and Protection
4 works
₹52.73 L sanctioned
₹40.99 L spent (78%)
10
Deepening / Desilting of Flood Channels
5 works
₹44.94 L sanctioned
₹25.47 L spent (57%)